View Postorulz, on Jun 2 2009, 09:01 PM, said:

Bull City Rising mentions that the design for the bridge over I-40 has been released on Durham's website (along with a color rendering.) This one's supposed to be done in 2010.

In an earlier post, they also show the proposed pedestrian bridge over NC147.  I actually like that one much better....but since it has fewer lanes to cross, I guess they're better able to concentrate on aesthetics.

 

#102 orulz

orulz

    Town

  • Moderators
  • 3,517 posts
  • Location:Raleigh, NC

Posted 01 March 2010 - 11:06 AM

Greenways update.

Joe Miller reports on his blog that the House Creek Greenway is on target to start construction this April. This will take almost 2 years to complete because of the tunnels under Lake Boone and Glen Eden.

He also mentions that the entire Neuse greenway will be complete by 2014, including extensions of the Crabtree and Walnut Creek greenways that will connect them together.

Also, I've noticed that the Rocky Branch Greenway through NCSU is almost complete, and the next phase of the Centennial Campus Greenway, along the north shore of Lake Raleigh perhaps as far as Trailwood Drive, is under construction. This would link the Centennial Campus trails to Lake Johnson.

It looks like The American Tobacco Trail now is open and complete, except for the short segment with the bridge over I-40. That's supposed to start construction in June 2010 and be finished by June 2011.

#103 JeffC

JeffC

    Hamlet

  • Members+
  • PipPipPipPip
  • 473 posts
  • Location:Raleigh, NC

Posted 08 March 2010 - 01:55 PM

View Postorulz, on 01 March 2010 - 11:06 AM, said:

Greenways update.

(snip)

Also, I've noticed that the Rocky Branch Greenway through NCSU is almost complete, and the next phase of the Centennial Campus Greenway, along the north shore of Lake Raleigh perhaps as far as Trailwood Drive, is under construction. This would link the Centennial Campus trails to Lake Johnson.


Where will the Centennial Campus trail cross Gorman to link up with the Lake Johnson trails?  I assume at a grade crossing, right?  That will be pretty dangerous, given the relatively high speeds folks drive on Gorman, but I guess a tunnel under the road would be prohibitively expensive...

#104 orulz

orulz

    Town

  • Moderators
  • 3,517 posts
  • Location:Raleigh, NC

Posted 09 March 2010 - 08:41 AM

View PostJeffC, on 08 March 2010 - 01:55 PM, said:

Where will the Centennial Campus trail cross Gorman to link up with the Lake Johnson trails?  I assume at a grade crossing, right?  That will be pretty dangerous, given the relatively high speeds folks drive on Gorman, but I guess a tunnel under the road would be prohibitively expensive...
The trail from Lake Johnson already crosses Gorman (ending at Trailwood), and yes, it is at a crosswalk with no signal. Visibility is good at the very least, but it does suck to cross it.

From what I've seen that particular stretch of Gorman usually isn't very busy (for a four lane road) so at some point they could probably put in a signal. Or then again, if they're putting in new tunnels under Lake Boone and Glen Eden on the House Creek Greenway, I suppose it's not out of the question that they could eventually do the same here, though there are other improvements in the system I'd prioritize first. But as far as I'm aware, this is the worst street crossing in the entire Raleigh greenway system.

#105 JeffC

JeffC

    Hamlet

  • Members+
  • PipPipPipPip
  • 473 posts
  • Location:Raleigh, NC

Posted 09 March 2010 - 03:20 PM

View Postorulz, on 09 March 2010 - 08:41 AM, said:

The trail from Lake Johnson already crosses Gorman (ending at Trailwood), and yes, it is at a crosswalk with no signal. Visibility is good at the very least, but it does suck to cross it.

From what I've seen that particular stretch of Gorman usually isn't very busy (for a four lane road) so at some point they could probably put in a signal. Or then again, if they're putting in new tunnels under Lake Boone and Glen Eden on the House Creek Greenway, I suppose it's not out of the question that they could eventually do the same here, though there are other improvements in the system I'd prioritize first. But as far as I'm aware, this is the worst street crossing in the entire Raleigh greenway system.


SO I've never ridden on that greenway...so when this link is done, there will be a paved trail from Centennial Parkway/Mission Valley area all the way down to Lake Johnson?  Sounds like a really cool bike ride...

#106 orulz

orulz

    Town

  • Moderators
  • 3,517 posts
  • Location:Raleigh, NC

Posted 09 March 2010 - 04:01 PM

View PostJeffC, on 09 March 2010 - 03:20 PM, said:

SO I've never ridden on that greenway...so when this link is done, there will be a paved trail from Centennial Parkway/Mission Valley area all the way down to Lake Johnson?  Sounds like a really cool bike ride...

When the Centennial Campus Greenway and the is finished there will be a greenway all the way from Lake Johnson to the Neuse River.

#107 JeffC

JeffC

    Hamlet

  • Members+
  • PipPipPipPip
  • 473 posts
  • Location:Raleigh, NC

Posted 11 March 2010 - 05:36 PM

How so? via the Walnut Creek Greenway?

How sketchy is that Greenway once it leaves the Farmers Market area and cuts through S. Saunders area, etc. across SE Raleigh?  Would it be reasonably safe during daylight hours?

Edited by JeffC, 11 March 2010 - 05:37 PM.


#108 orulz

orulz

    Town

  • Moderators
  • 3,517 posts
  • Location:Raleigh, NC

Posted 12 March 2010 - 09:31 AM

View PostJeffC, on 11 March 2010 - 05:36 PM, said:

How so? via the Walnut Creek Greenway?

How sketchy is that Greenway once it leaves the Farmers Market area and cuts through S. Saunders area, etc. across SE Raleigh?  Would it be reasonably safe during daylight hours?
Honestly there's at least one part that's always seemed sketchy to me. Between Fayetteville and S Wilmington streets, near Walnut Terrace, at times when I've gone by it has seemed strewn with litter and seems there have at times been a lot of homeless people or just others loitering. It kind of feels like an out-of-the-way place that people go to do things they can't do in plain sight.

I've not ventured further east on the greenway than Wilmington Street, and even that was four or five years ago.

#109 Jones133

Jones133

    Town

  • Members+
  • 2,728 posts
  • Location:Downtown Raleigh NC

Posted 13 March 2010 - 12:32 PM

There is  a homeless camp next to the greenway under  the South Saunders Bridge (and one near the Dix soccer fields too, on the greenway), so you are right that trash and such could be coming from there. I also have encountered wandering guys clearly on something and young guys who maybe had sold it to the f-d up guys. The below grade setup sort of lends itself to this.

#110 orulz

orulz

    Town

  • Moderators
  • 3,517 posts
  • Location:Raleigh, NC

Posted 22 March 2010 - 10:55 AM

A contract is going to be awarded for construction of the House Creek Greenway at tomorrow's council meeting. The cost is $3.8 million dollars. This is the only second project I can think of in which the city is building a new grade separation from an existing road specifically for a greenway. (The first is the bridge near the art museum.)

Most of the existing grade separations in town take advantage of existing bridges over creeks, involved retrofitting an existing culvert, or were built as a small part of a major road improvement project (like Rocky Branch tunnel under Dawson/Mcdowell.)

This is an exciting development. It means that the standard that the city follows for greenway construction is increasing, and that maybe there's the possibility of new grade separations where there currently are none.

#111 orulz

orulz

    Town

  • Moderators
  • 3,517 posts
  • Location:Raleigh, NC

Posted 28 March 2010 - 05:59 PM

The "missing link" on the Rocky Branch Greenway through NCSU is now open. Quite a big project, with a really fancy railing.  IMO it will look a bit little bit strange for 10 years or so until the new trees they've planted have filled out a bit, but as a transportation corridor it's set.

#112 miamiblue

miamiblue

    Whistle-Stop

  • Members+
  • PipPipPip
  • 169 posts
  • Location:Downtown Raleigh

Posted 04 April 2010 - 07:59 PM

I received a flyer the other day about the vacant lot at 405 Hillsborough St. It appears that local attorney David Permar and Exploris Middle School students are trying to make this lot into a community park. They are hoping that supporters will attend the City Council Meeting on April 6th.

#113 NCMike1981

NCMike1981

    Burg

  • Members+
  • PipPipPipPipPip
  • 1,044 posts
  • Location:Cary, NC

Posted 08 August 2010 - 04:07 PM

So today I was walking on the greenway in Raleigh, I usually get on the greenway at Anderson behind the school and follow the trail past Wake Forest and Atlantic, usually stopping at Capital Blvd. Today I decided to go a bit further despite the heat b/c my curiousity got the better of me...and it was like I had stepped into a different world! The trail became this massive boardwalk through what appears to be a swamp. It was very cool but it ended at this 4 lane road (upon looking at maps appears to be Raleigh Blvd near Crabtree Blvd). At that point I figured time to turn around as I was about 2 1/2 miles from the car but I noticed when I was right at what appeared to be the end of the trail at Raleigh Blvd it had a mile marker 0 indicator. Does the greenway end at Raleigh Blvd or if you just cross over the road does it continue on a bit. I didn't wanna stand on the edge of a major thoroughfare looking for a greenway sign across the street but it felt like the end....however it looks like it may continue across according to some online maps.... Thanks!

Edited by NCMike1981, 08 August 2010 - 04:10 PM.


#114 Jones133

Jones133

    Town

  • Members+
  • 2,728 posts
  • Location:Downtown Raleigh NC

Posted 08 August 2010 - 06:22 PM

View PostNCMike1981, on 08 August 2010 - 04:07 PM, said:

So today I was walking on the greenway in Raleigh, I usually get on the greenway at Anderson behind the school and follow the trail past Wake Forest and Atlantic, usually stopping at Capital Blvd. Today I decided to go a bit further despite the heat b/c my curiousity got the better of me...and it was like I had stepped into a different world! The trail became this massive boardwalk through what appears to be a swamp. It was very cool but it ended at this 4 lane road (upon looking at maps appears to be Raleigh Blvd near Crabtree Blvd). At that point I figured time to turn around as I was about 2 1/2 miles from the car but I noticed when I was right at what appeared to be the end of the trail at Raleigh Blvd it had a mile marker 0 indicator. Does the greenway end at Raleigh Blvd or if you just cross over the road does it continue on a bit. I didn't wanna stand on the edge of a major thoroughfare looking for a greenway sign across the street but it felt like the end....however it looks like it may continue across according to some online maps.... Thanks!
It picks up again on the south edge of the bridge....look just to the right when you step out onto Raleigh Blvd. Similar to the zig zag at Lassiter Mill

#115 citiboi27610

citiboi27610

    Whistle-Stop

  • Members+
  • PipPipPip
  • 145 posts
  • Location:miami (coral gables), fl

Posted 10 August 2010 - 06:54 PM

Yes, if you cross Raleigh Blvd. and continue on the trail starting at the intersection with Crabtree Blvd. you'll eventually end up close to WakeMed.

#116 NCMike1981

NCMike1981

    Burg

  • Members+
  • PipPipPipPipPip
  • 1,044 posts
  • Location:Cary, NC

Posted 06 April 2011 - 08:23 PM

Some recent pics from the greenway, along the stretch from Capital Blvd to Raleigh Blvd:

Posted Image

Posted Image

Posted Image

Posted Image

Posted Image

Posted Image

Posted Image

Posted Image

Posted Image

Posted Image




0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users