This has become a Hazard for the many tourists navigating the Dam as well as a bottleneck on the only hiway that links AZ with NV.
The centerpiece of the project is a concrete arch, steel deck bridge with 1500 feet of clear span, 840 feet above the river, that will carry four lanes of traffic. It will be the largest concrete arch bridge in the US. Gee, another record.
With the opening of the bridge in 2008 all traffic will be diverted from the dam making the dam a pedestrian friendly place.


B)

















