The Future of Spartanburg's Downtown Memorial Airport
#41
Posted 03 November 2011 - 10:07 AM
#42
Posted 19 November 2011 - 03:44 PM
#43
Posted 23 November 2011 - 01:46 PM
westsider28, on 19 November 2011 - 03:44 PM, said:
I, too, attended the grand "re-opening" and glad you feel the facility is state-of-the-art. As a regular user of the airport someone may feel my opinions on the airport are always favorable.
#44
Posted 23 November 2011 - 05:20 PM
#45
Posted 25 November 2011 - 07:28 AM
spartanburgh, on 23 November 2011 - 05:20 PM, said:
The runway will be extended on it's north end, where the lake is, or was.
For sure lots of fill will be required but when GSP's runway was extended several years ago the fill requirements were much more extensive than this.
Hope your children had a nice time at the airport!
#46
Posted 25 November 2011 - 02:28 PM
#47
Posted 25 November 2011 - 03:11 PM
spartanburgh, on 25 November 2011 - 02:28 PM, said:
The ILS instrument approach is only available to runway 5, the opposite end of the runway. Visual approaches to the opposite end of the runway (23) are not impacted by the Denny's tower or other obstacles.
#48
Posted 08 December 2011 - 08:48 PM
roads-scholar, on 25 November 2011 - 07:28 AM, said:
For sure lots of fill will be required but when GSP's runway was extended several years ago the fill requirements were much more extensive than this.
Any idea what's going to happen with Airport Road? With the runway being extended in that direction, the road would either have to snake even more dramatically than currently to go around the extension or go through a tunnel under the runway.
#49
Posted 09 December 2011 - 07:09 AM
westsider28, on 08 December 2011 - 08:48 PM, said:
I have not heard anything regarding Airport Road.
#50
Posted 20 February 2012 - 03:32 PM
- GDJ will be building another hangar for large corporate aircraft.
- Taxiways and apron areas will be reconstructed. Current asphalt will be replaced with concrete.
- Runway safety areas. 1500' of land acquisition off runway 23 will create a runway safety zone of 1000' and a 500' runway extension. A shorter safety area will be constructed off runway 5 (up to Southport Road). These projects should be completed in 2014.