I haven't read through the entire page here, but shouldn't Capitol Cove Phase 1 be under "completed," along with the Moran Shipping HQ?

 

#262 mental757

mental757

    Burg

  • Members+
  • PipPipPipPipPip
  • 2,050 posts
  • Location:Kent County

Posted 27 January 2010 - 09:21 AM

Yes, I missed Cap cove phase 1.  Has Moran moved in yet?  An Oct 15, 2009 projo article said it was still "underway."

thanks.

#263 mental757

mental757

    Burg

  • Members+
  • PipPipPipPipPip
  • 2,050 posts
  • Location:Kent County

Posted 27 January 2010 - 09:33 AM

ALCO Phase 1:      ** Completed 1/2007 **
AS220 Dreyfuss:                                              ** Open/complete **
Providence Renaissance Hotel (Masonic Temple):   ** Open/complete **
Westin II Hotel addition:                              ** Open/Complete **
Wickenden St. Comm CTR & Library:       ** Open/Complete **
IWAY: I-95N to I-195E opens (new bridge):   ** OPEN **
Westin II Condo tower:                               ** Open/Complete **
333 Atwells Condos & new Walgreens:         ** Open/Complete **
Miriam Hospital expansion:                         ** Open/Complete **
Davol new HQ - Warwick at the Crossings:    ** Open/Complete **
Union Wadding Condos - Pawtucket, Phase 1:  ** Open/Complete - 5/16/08 **
Waterplace Condo Towers I & II:                 ** Open / Complete - September 2008 **
Dunkin Donuts renovations:                      ** Open/Complete - September 2008 **
NYLO Hotel - Pontiac Mill, Warwick:               ** Open/Complete - September 2, 2008 **
JWU student services center - Rolo Building: ** Open/Complete **
RISD Chace Center:    ** Open/Complete - September 27, 2008 **
Roger William's Zoo; 'Plains of Africa' upgrade:    ** Open/Complete - October 23, 2008 **
RI Hosp. Bridge Building expansion:      ** Open/Complete November 2008 **
Slater Mill lofts - Pawtucket:               ** Open/Complete **
IWAY: 95S to 195E ramp:                      ** Open/Complete - December 6, 2008 **
URI Biotech building, Kingston campus:     ** Open/Complete - January 26, 2009 **
St. Francis chapel reno/addition to Hampton Inn:   ** Open/Compete 3/30/09 **
T. F. Green Airport Terminal Renovations:   ** Complete March 2009 **
Wayland Square Armory Condos:  ** Open/complete - spring 2009 **
Providence Post Office expansion:     ** Complete May 2009 **
URI Ocean Research Center - Narrragansett:    ** Open/Complete June 1 2009 **
IWAY: 195W to 95S:                  ** Open/Complete - 6/18/09 **
Tower at Carnegie Abbey:          ** Open/Complete - 6/27/09 **
UPDATED:Capitol Cove Condos, Providence - phase I (96 units leased to JWU for dorms): ** Open/Complete - September 2009 **
Women and Infants Hospital renovation:       ** Compete 9/14/09 **
New FM Global HQ building - Johnston:      ** Open/Complete 9/17/09 **
United Natural Foods new HQ; ALCO project - Providence: ** Complete 9/20/09 **
New BCBS HQ building - Providence: **Open/Complete 10/13/09 **
IWAY: 195W to 95N:  ** Open/Complete October 22, 2009 **
Park Theatre Renovation; Cranston:   ** Open/Complete October 23, 2009 **
UPDATED:Former RI Medical Society Bldg renovation into Moran Shipping HQ - Francis St. Prov.: ** Open/Complete - late 2009 **
Weybosset Parking Towers: Canceled
Hampton Inn - Pawtucket:        was late 2008 - pretty much canceled - summer 2009
Foundry/Sharpe Building - final phase:           was end of 2008 - awaiting tenant to finish project
Washington Bridge replacement:                   December 2008 (partial completion 12/6/08) ??
Pier Village Marketplace - Narragansett mixed use:  May 2009
Sierra Hotel:      was mid 2009  (site demo completed fall 2008 - project on hold)
Hilton parking garage:                                         was 2009 (project on hold)
Weybosset Mills Condo renovation: was June 2009 - development sold - JAN 09; status unclear
4 points Sheraton Promenade St.:     June 2009? (status unknown)
Chapel View mixed use/multi bldg. development/rehab - Cranston:  was September 2009
New Rt. 403 Highway: Fall 2009 (highway **opened** 10/22/08 - finish work remains)
Bradley Hospital expansion:         ** phase 1 completed March 2009 ** November 2009
Ethanol Plant - Quonset:     December 2009? (supposedly still planned)
Steeple St. Bldg. Restoration:   January 2010
Fogarty Building project (garage/retail):   was early 2010 - now delayed
The Box Office (cargo container building) Harris Ave. Prov.:   April 2010
Wheeler School Expansion:   new student center is complete, new building = Spring 2010, renovate 'old' building = fall 2010
ALCO Phase 2:                               Spring 2010
Dynamo House, Heritage Harbor Museum, Aloft Hotel:     was June 2010, now delayed indef.
RW's Zoo; 'Children's Zoo' & new Vet clinic:  June 2010 (construction start = spring 2009)
Biodiesel Plant - Quonset:  mid 2010
AS220 - Mercantile Building renovation, Providence:   September 2010
Turning Point Vets Apts; Broad St. Providence: November 2010
Residence Inn - downcity:   2010
Newport Hilton/Marriott - 310 W Main Rd.:   2010
Vista Della Torre:            (was) mid to late 2010
Warwick Intermodal Transportation Center:  fall 2010 (contruction underway - fall 2008)
Union Wadding Condos - Pawtucket, final build-out:  2010
110 & 'W' hotel:     was 2010 (site demo & prep complete - project on hold as of summer 2008)
Providence Piers/Conley Wharf project:     was 2010 - project on hold, site possibly to be sold (8/25/09)
7th Wave Resort - indoor water park & resort: was late 2010 - project on hold due to funding issues (11/08)
Empire at Broadway:          was December 2010, project on hold
Wickford Rail Station:     early 2011 - RI bought land to build; January 2010
Brown's new Art Center:                                early 2011
Village on the Waterfront - EP; mixed use - Phase 1:  2011
new URI Pharmacy building, Kingston campus:   2011
Brown Medical School HQ - 222 Richmond St.:  August 2011
Roger William's Zoo: 'North American Trail' upgrade & new polar bear exhibit:           2012
'Old' 195 highway demo & cleared, new streets:  mid 2012    
ALCO 'final' phases:             2012
Sakonnet River Bridge replacement: 2012
East Pointe - EP:                                           2012
JWU Campus build-out:                                 2012
Wind Turbine Farm - offshore from Block Island:   2012
Waterfront Park:                                          late 2012    
Kettle Point - EP:                          ** CANCELLED JANUARY 2010 **

GREEN= open/complete
BOLD = in progress
RED = announced/planned

#264 09/21/38

09/21/38

    Whistle-Stop

  • Members+
  • PipPipPip
  • 238 posts
  • Location:Smith Hill -- Providence, RI

Posted 11 February 2010 - 08:33 AM

When do the Cancelled Projects get cancelled off this list?  How about a fourth color.  Blue.  For those announced projects that still have some realistic hope of breaking ground in the next twelve months.

The doubtful projects should be left in red.



#265 mental757

mental757

    Burg

  • Members+
  • PipPipPipPipPip
  • 2,050 posts
  • Location:Kent County

Posted 14 May 2010 - 08:51 AM

ALCO Phase 1:      ** Completed 1/2007 **
AS220 Dreyfuss:                                              ** Open/complete **
Providence Renaissance Hotel (Masonic Temple):   ** Open/complete **
Westin II Hotel addition:                              ** Open/Complete **
Wickenden St. Comm CTR & Library:       ** Open/Complete **
IWAY: I-95N to I-195E opens (new bridge):   ** OPEN **
Westin II Condo tower:                               ** Open/Complete **
333 Atwells Condos & new Walgreens:         ** Open/Complete **
Miriam Hospital expansion:                         ** Open/Complete **
Davol new HQ - Warwick at the Crossings:    ** Open/Complete **
Union Wadding Condos - Pawtucket, Phase 1:  ** Open/Complete - 5/16/08 **
Waterplace Condo Towers I & II:                 ** Open / Complete - September 2008 **
Dunkin Donuts renovations:                      ** Open/Complete - September 2008 **
NYLO Hotel - Pontiac Mill, Warwick:               ** Open/Complete - September 2, 2008 **
JWU student services center - Rolo Building: ** Open/Complete **
RISD Chace Center:    ** Open/Complete - September 27, 2008 **
Roger William's Zoo; 'Plains of Africa' upgrade:    ** Open/Complete - October 23, 2008 **
RI Hosp. Bridge Building expansion:      ** Open/Complete November 2008 **
Slater Mill lofts - Pawtucket:               ** Open/Complete **
IWAY: 95S to 195E ramp:                      ** Open/Complete - December 6, 2008 **
URI Biotech building, Kingston campus:     ** Open/Complete - January 26, 2009 **
St. Francis chapel reno/addition to Hampton Inn:   ** Open/Compete 3/30/09 **
T. F. Green Airport Terminal Renovations:   ** Complete March 2009 **
Wayland Square Armory Condos:  ** Open/complete - spring 2009 **
Providence Post Office expansion:     ** Complete May 2009 **
URI Ocean Research Center - Narrragansett:    ** Open/Complete June 1 2009 **
IWAY: 195W to 95S:                  ** Open/Complete - 6/18/09 **
Tower at Carnegie Abbey:          ** Open/Complete - 6/27/09 **
Capitol Cove Condos, Providence - phase I (96 units leased to JWU for dorms): ** Open/Complete - September 2009 **
Women and Infants Hospital renovation:       ** Compete 9/14/09 **
New FM Global HQ building - Johnston:      ** Open/Complete 9/17/09 **
United Natural Foods new HQ; ALCO project - Providence: ** Complete 9/20/09 **
New BCBS HQ building - Providence: **Open/Complete 10/13/09 **
IWAY: 195W to 95N:  ** Open/Complete October 22, 2009 **
Park Theatre Renovation; Cranston:   ** Open/Complete October 23, 2009 **
Former RI Medical Society Bldg renovation into Moran Shipping HQ - Francis St. Prov.: ** Open/Complete - late 2009 **
Weybosset Parking Towers: Canceled
Hampton Inn - Pawtucket:        was late 2008 - pretty much canceled - summer 2009
Foundry/Sharpe Building - final phase:           was end of 2008 - awaiting tenant to finish project
Washington Bridge replacement:                   December 2008 (partial completion 12/6/08) ??
Pier Village Marketplace - Narragansett mixed use:  May 2009
Sierra Hotel:      was mid 2009  (site demo completed fall 2008 - project on hold)
Hilton parking garage:                                         was 2009 (project on hold)
Weybosset Mills Condo renovation: was June 2009 - development sold - JAN 09; status unclear
4 points Sheraton Promenade St.:     June 2009? (status unknown)
Chapel View mixed use/multi bldg. development/rehab - Cranston:  was September 2009
New Rt. 403 Highway: Fall 2009 (highway **opened** 10/22/08 - finish work remains)
Bradley Hospital expansion:         ** phase 1 completed March 2009 ** November 2009
Ethanol Plant - Quonset:     December 2009? (supposedly still planned)
Steeple St. Bldg. Restoration:   January 2010
Fogarty Building project (garage/retail):   was early 2010 - now delayed
The Box Office (cargo container building) Harris Ave. Prov.:   April 2010
Wheeler School Expansion:   new student center is complete, new building = Spring 2010, renovate 'old' building = fall 2010
ALCO Phase 2:                               Spring 2010
Dynamo House, Heritage Harbor Museum, Aloft Hotel:     was June 2010, now delayed indef.
RW's Zoo; 'Children's Zoo' & new Vet clinic:  June 2010 (construction start = spring 2009)
Biodiesel Plant - Quonset:  mid 2010
AS220 - Mercantile Building renovation, Providence:   September 2010
Turning Point Vets Apts; Broad St. Providence: November 2010
Residence Inn - downcity:   2010
Newport Hilton/Marriott - 310 W Main Rd.:   2010
Vista Della Torre:            (was) mid to late 2010
Warwick Intermodal Transportation Center:  fall 2010 (contruction started in fall 2008)
Union Wadding Condos - Pawtucket, final build-out:  2010
110 & 'W' hotel:     was 2010 (site demo & prep complete - project on hold as of summer 2008)
Providence Piers/Conley Wharf project:     was 2010 - project on hold, site possibly to be sold (8/25/09)
7th Wave Resort - indoor water park & resort: was late 2010 - project on hold due to funding issues (11/08)
Empire at Broadway:          was December 2010, project on hold
Wickford Rail Station:     early 2011 - RI bought land to build; January 2010
ADDED:Towne Place Suites by Marriott; Quonset business park - February 2011
Brown's new Art Center:                                early 2011
Village on the Waterfront - EP; mixed use - Phase 1:  2011
new URI Pharmacy building, Kingston campus:   2011
Brown Medical School HQ - 222 Richmond St.:  August 2011
Roger William's Zoo: 'North American Trail' upgrade & new polar bear exhibit:           2012
'Old' 195 highway demo & cleared, new streets:  mid 2012    
ALCO 'final' phases:             2012
Sakonnet River Bridge replacement: 2012
East Pointe - EP:                                           2012
JWU Campus build-out:                                 2012
Wind Turbine Farm - offshore from Block Island:   2012
Waterfront Park:                                          late 2012    
Kettle Point - EP:                          ** CANCELLED JANUARY 2010 **

GREEN= open/complete
BOLD = in progress
RED = announced/planned

#266 mental757

mental757

    Burg

  • Members+
  • PipPipPipPipPip
  • 2,050 posts
  • Location:Kent County

Posted 24 May 2010 - 01:05 PM

ALCO Phase 1:      ** Completed 1/2007 **
AS220 Dreyfuss:                                              ** Open/complete **
Providence Renaissance Hotel (Masonic Temple):   ** Open/complete **
Westin II Hotel addition:                              ** Open/Complete **
Wickenden St. Comm CTR & Library:       ** Open/Complete **
IWAY: I-95N to I-195E opens (new bridge):   ** OPEN **
Westin II Condo tower:                               ** Open/Complete **
333 Atwells Condos & new Walgreens:         ** Open/Complete **
Miriam Hospital expansion:                         ** Open/Complete **
Davol new HQ - Warwick at the Crossings:    ** Open/Complete **
Union Wadding Condos - Pawtucket, Phase 1:  ** Open/Complete - 5/16/08 **
Waterplace Condo Towers I & II:                 ** Open / Complete - September 2008 **
Dunkin Donuts renovations:                      ** Open/Complete - September 2008 **
NYLO Hotel - Pontiac Mill, Warwick:               ** Open/Complete - September 2, 2008 **
JWU student services center - Rolo Building: ** Open/Complete **
RISD Chace Center:    ** Open/Complete - September 27, 2008 **
Roger William's Zoo; 'Plains of Africa' upgrade:    ** Open/Complete - October 23, 2008 **
RI Hosp. Bridge Building expansion:      ** Open/Complete November 2008 **
Slater Mill lofts - Pawtucket:               ** Open/Complete **
IWAY: 95S to 195E ramp:                      ** Open/Complete - December 6, 2008 **
URI Biotech building, Kingston campus:     ** Open/Complete - January 26, 2009 **
St. Francis chapel reno/addition to Hampton Inn:   ** Open/Compete 3/30/09 **
T. F. Green Airport Terminal Renovations:   ** Complete March 2009 **
Wayland Square Armory Condos:  ** Open/complete - spring 2009 **
Providence Post Office expansion:     ** Complete May 2009 **
URI Ocean Research Center - Narrragansett:    ** Open/Complete June 1 2009 **
IWAY: 195W to 95S:                  ** Open/Complete - 6/18/09 **
Tower at Carnegie Abbey:          ** Open/Complete - 6/27/09 **
Capitol Cove Condos, Providence - phase I (96 units leased to JWU for dorms): ** Open/Complete - September 2009 **
Women and Infants Hospital renovation:       ** Compete 9/14/09 **
New FM Global HQ building - Johnston:      ** Open/Complete 9/17/09 **
United Natural Foods new HQ; ALCO project - Providence: ** Complete 9/20/09 **
New BCBS HQ building - Providence: **Open/Complete 10/13/09 **
IWAY: 195W to 95N:  ** Open/Complete October 22, 2009 **
Park Theatre Renovation; Cranston:   ** Open/Complete October 23, 2009 **
Former RI Medical Society Bldg renovation into Moran Shipping HQ - Francis St. Prov.: ** Open/Complete - late 2009 **
Weybosset Parking Towers: Canceled
Hampton Inn - Pawtucket:        was late 2008 - pretty much canceled - summer 2009
Foundry/Sharpe Building - final phase:           was end of 2008 - awaiting tenant to finish project
Washington Bridge replacement:                   December 2008 (partial completion 12/6/08) ??
Pier Village Marketplace - Narragansett mixed use:  May 2009
Sierra Hotel:      was mid 2009  (site demo completed fall 2008 - project on hold)
Hilton parking garage:                                         was 2009 (project on hold)
Weybosset Mills Condo renovation: was June 2009 - development sold - JAN 09; status unclear
4 points Sheraton Promenade St.:     June 2009? (status unknown)
Chapel View mixed use/multi bldg. development/rehab - Cranston:  was September 2009
New Rt. 403 Highway: Fall 2009 (highway **opened** 10/22/08 - finish work remains)
Bradley Hospital expansion:         ** phase 1 completed March 2009 ** November 2009
Ethanol Plant - Quonset:     December 2009? (supposedly still planned)
Steeple St. Bldg. Restoration:   January 2010
Fogarty Building project (garage/retail):   was early 2010 - now delayed
The Box Office (cargo container building) Harris Ave. Prov.:   April 2010
Wheeler School Expansion:   new student center is complete, new building = Spring 2010, renovate 'old' building = fall 2010
ALCO Phase 2:                               Spring 2010
Dynamo House, Heritage Harbor Museum, Aloft Hotel:     was June 2010, now delayed indef.
Biodiesel Plant - Quonset:  mid 2010
AS220 - Mercantile Building renovation, Providence:   September 2010
Turning Point Vets Apts; Broad St. Providence: November 2010
Residence Inn - downcity:   2010
Newport Hilton/Marriott - 310 W Main Rd.:   2010
Vista Della Torre:            (was) mid to late 2010
Warwick Intermodal Transportation Center:  fall 2010 (contruction started in fall 2008)
Union Wadding Condos - Pawtucket, final build-out:  2010
110 & 'W' hotel:     was 2010 (site demo & prep complete - project on hold as of summer 2008)
Providence Piers/Conley Wharf project:     was 2010 - project on hold, site possibly to be sold (8/25/09)
7th Wave Resort - indoor water park & resort: was late 2010 - project on hold due to funding issues (11/08)
Empire at Broadway:          was December 2010, project on hold
Towne Place Suites by Marriott; Quonset business park - February 2011
Brown's new Art Center:                                early 2011
Village on the Waterfront - EP; mixed use - Phase 1:  2011
new URI Pharmacy building, Kingston campus:   2011
UPDATED: Wickford Rail Station:     Mid 2011
Brown Medical School HQ - 222 Richmond St.:  August 2011
UPDATED: RW's Zoo; 'Children's Zoo':  2012
Roger William's Zoo: 'North American Trail' upgrade & new polar bear exhibit:           2012
'Old' 195 highway demo & cleared, new streets:  mid 2012    
ALCO 'final' phases:             2012
Sakonnet River Bridge replacement: 2012
East Pointe - EP:                                           2012
JWU Campus build-out:                                 2012
Wind Turbine Farm - offshore from Block Island:   2012
Waterfront Park:                                          late 2012    
Kettle Point - EP:                          ** CANCELLED JANUARY 2010 **

GREEN= open/complete
BOLD = in progress
RED = announced/planned

Edited by mental757, 24 May 2010 - 01:10 PM.


#267 09/21/38

09/21/38

    Whistle-Stop

  • Members+
  • PipPipPip
  • 238 posts
  • Location:Smith Hill -- Providence, RI

Posted 16 August 2010 - 02:04 PM

RI School for the Deaf  $24,000,000 new construction and refurbished gym on exisiting campus.  Completion date: fall 2010.

Warwick Intermodal Center is now called the Interlink officially.

Wickford Train Station ground breaking ceremony was held this week.