
The South Station development will consist of the completion of the South Station Transportation Center at the lower levels of the project plus the addition of a 40-story, 1.1 million-square-foot office tower, a 500-room hotel, a nine-story 430,000-square-foot office/research building, and parking for approximately 1,050 cars.
Important considerations in the master plan were the preservation of the historic South Station Head House building; the linkage of the existing train station and bus terminal; and the ability to facilitate future pedestrian access to the waterfront. Hines is currently taking the project through the local and state environmental permitting process.













