Jump to content


- - - - -

Hampton Development


  • Please log in to reply
202 replies to this topic

#201 urbanlife

urbanlife

    Burg

  • Members+
  • PipPipPipPipPip
  • 2,069 posts

Posted 10 June 2010 - 01:15 PM

That is good news, there is so much potential with Hampton's downtown.  It already has the infrastructure in place to create a great little downtown, they just need more development to give people a reason to be down there.

 

#202 PeninsulaKiddo

PeninsulaKiddo

    Burg

  • Members+
  • PipPipPipPipPip
  • 1,122 posts
  • Location:Poquoson, Va

Posted 21 June 2010 - 02:13 PM

http://www.dailypres...,0,246141.story

Interesting little read... I know a few people involved in the group of LGBT young professionals trying to kickstart this.  Good, intelligent, and hard-working group that has great ideas; I'd love to see them come to fruition. :)

And I've always thought that Phoebus had a lot of potential, and there are good bones in the community to build up from.

#203 ronsmytheiii

ronsmytheiii

    Hamlet

  • Members+
  • PipPipPipPip
  • 657 posts
  • Location:Virginia beach, VA

Posted 14 January 2012 - 09:06 PM

Quote

NASA awarded a $42 million contract to a Maryland company to build a new cafeteria and conference center at Langley Research Center in Hampton.
Construction of the facilities, which will be under the same roof, is expected to start this spring. NASA hopes to finish work in December 2013.
It is the second phase of New Town, NASA's $330 million plan to modernize Langley, which was founded in 1917 as aeronautics research laboratory. NASA absorbed Langley at the dawn of the space age in 1958.

Quote

Wyman said New Town, which includes demolishing dozens of facilities, will address the issue. The plan's first phase — a $26 million, 79,000-square-foot environmentally-friendly office building — opened last June.
The work was performed by The Whiting-Turner Contracting Co., Baltimore, the same outfit chosen to build the cafeteria and conference center. Whiting-Turner was the low bidder among 22 companies.
At 137,000-square-feet, plans include a 230-seat theater, a balcony for outdoor dining, a full kitchen and a television studio. NASA demolished four buildings — roughly 53,000-square-feet, mostly office space — to make way for the new building.
It is expected to replace the Pearl Young Theater, the Reid Conference Center and the existing cafeteria, a 65-year-old building that underwent $360,000 in renovations last decade. All three buildings are scheduled to be demolished, though NASA hasn't determined when, Wyman said.
The third phase of New Town is a 150,000-square-foot sciences laboratory expected to cost $93 million, he said. NASA leaders approved the laboratory but they have not allocated money to build it.

Posted Image




1 user(s) are reading this topic

0 members, 1 guests, 0 anonymous users