Jump to content

Exploring Broderick Tower


Allan

Recommended Posts

Continued from Part Two

Here's what most of you have probably been waiting for: The views from the tower.

Ford Field from the tower

IMG_6400.jpg

The sun sets over downtown

IMG_6434.jpg

The Renaissance Center

IMG_6435.jpg

Looking out on downtown through a penthouse door.

IMG_6442.jpg

This view pretty much framed itself.

IMG_6455.jpg

The sun slips behind the clouds.

IMG_6461.jpg

The Opera House demolition is occuring on the left, while the new YMCA rises in the center.

IMG_6462.jpg

The Metropolitan Building

IMG_6463.jpg

Old buildings along Woodward Avenue

IMG_6467.jpg

Looking down

IMG_6482.jpg

The Financial District

IMG_6484.jpg

IMG_6531.jpg

IMG_6533.jpg

Renaissance Center

IMG_6538.jpg

Washington Boulevard

IMG_6929.jpg

Book Tower

IMG_6575.jpg

The West Side of Grand Circus Park

IMG_6921.jpg

IMG_6854.jpg

IMG_6897.jpg

Looking north towards New Center

IMG_6908.jpg

Looking northwest

IMG_6922.jpg

Ford Field

IMG_6954.jpg

IMG_6951.jpg

Part One

Part Two

Part Three

Link to comment
Share on other sites


  • Replies 14
  • Created
  • Last Reply

Thanks guys!

The tower renovation is supposed to start in about one year. The city wants something done with the building, since right now it is considered to be a huge "eyesore." City council had a six hour meeting two weeks ago specifically to discuss this building. They are trying to get things moving. The renovation was supposed to start in 2000, but it got caught up in the city bureaucracy.

Here are some more photos:

Renaissance Center through broken glass

IMG_5963.jpg

The abandoned Metropolitan Building (which will be converted into lofts)

IMG_5955.jpg

Book Tower

IMG_6002.jpg

The Statler Hotel is being demolished

IMG_6008.jpg

Another view off to the north

IMG_6146.jpg

I always wonder if anyone saw me hang out the window to get photos like this

IMG_5932.jpg

David Whitney Building

IMG_6074.jpg

One final skyline shot

IMG_6118.jpg

Link to comment
Share on other sites

Ok, I just got back from the Broderick, and I was told that Hines will be moving in equipment for the renovation in three weeks (which unfortunately means no more cool photos from the top). It's good for the building, but bad for me. Mike Higgins has been trying to renovate the Broderick for almost fifteen years now.

Since Hines stepped in, the renovation has really been pushed along. The city had a six hour meeting about the building two weeks ago. Two city council members, Maryann Mahaffey and Sheila Cockrel, have really helped push this along. The renovation plans are mostly complete. I don't know the name of the architecture firm who is doing the plans, but I'll post it as soon as I find out.

The entrance to the building will be redone. The new entrance will be via the adjacent Madison Theater, which is an old theater that was completely gutted a couple of years back. The Madison Theater will be renovated into offices for the Broderick Tower Apartments, and it will also be home to the Broderick leasing offices. The lobby for the apartments will be on the third floor. The lower two floors of both the Broderick and the Madison will be retail. The first floor bar will remain, and they plan to restore the mezzanine within the next couple of weeks. They've been trying to do it for a while, but are relying on volunteer labor to tear out the dropped ceiling.

The upper floors of the Broderick will have somewhere between 100 & 150 apartments. They have decided on an exact number, but I don't know what it is yet. There will be 3-4 per floor, depending on the floor. They are still deciding what to do with the penthouse. They want to try and do either a club or restaurant up there. However, that would require a dedicated elevator, and currently the elevators stop on the 32nd floor. The 33rd and 34th floors make up the penthouse apartment, where Mike Higgins lived up until ten years ago.

The building will be connected to the underground parking garage in Grand Circus Park, much like they did with the Kales Building renovation on the northwest corner of the park. Currently a portion of the Grand Circus garage is walled off. They will open that up and those spaces will be leased to the tenants. The portion that is walled off is supposedly part of what was supposed to be the main terminal of the mysterious subway system that was apparently started, but never completed.

They are working on a way to add something to the top of the tower that will light up at night. They want something that will change colors. I don't know if I like that idea, but any lighting on the building is good, because downtown's buildings aren't very will lit at night.

The new elevators for the building have been ordered, and are apparently sitting over in the Ramada Inn downtown. I will check that out to see if it's true or not.

Mike Higgins owns the Chicken Shack next to the Broderick, as well as the Tall Ezz shoes and Club Bleu. Mike seems to think he's going to rent out the Chicken Shack for $8000 per month! He's crazy if he thinks that! We should see some work on the Tall Ezz shoes place soon though, since Mike just got the papers signed the other day.

As with all development in Detroit, it's not official until you can walk through the doors into the completed building. I do have a good feeling about this, however.

I did get some excellent photos tonight, which I will post later, but I have to read 150 pages and do a rendering of a site plan by 8:00, and it's almost 1:30. I really want to get a couple hours of sleep in there, but I doubt that'll happen!

Link to comment
Share on other sites

Check your PMs. I've been through all 193,000 square feet, but I'm always up for another return trip. I am basically a regular tour guide of the place - I've spent close to 50 hours exploring the building so far. In my experience, the night shots of the interior come out much better than the daytime ones, unless you were to go on a sunny day (which are hard to come by in Michigan this time of year).

Link to comment
Share on other sites

  • 2 weeks later...

I just returned from Broderick Tower. They are still planning on starting the renovation in a week and a half to two weeks from now. The saga with Mike Higgins continues....Mike owns the Tavern on the Park, and he had his secretary use the Broderick checking account to pay for some other things related to the building. Because of that checks for to the gas and electric companies bounced when the bill was paid. So the electricity and gas at the Broderick will probably be shut off next week.

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.