I plan on being at the site often this summer, so expect picturials of the cranes going up. Ill probably host them at my grandrapids.8m.net site.

Share this post


Link to post
Share on other sites

Does anyone know when the Israels building is coming down? If anyone gets some pics of demolition, please post. Some before and after pics of the site would be cool too.

Share this post


Link to post
Share on other sites

So what is the scoop on the Riverfront Building? It says it will be done in December and I haven't seen any renderings. Does anybody know the scoop? What are they adding on? How many stories?

Joe

Both foundations aren't being dug and laid at the same time because an addition is being made to the Riverfront Building, which is situated on the same Campau Avenue parcel that will house the parking ramp. Work on the Riverfront should be finished in December, which means digging for the ramp's foundation can get started the following month.

<{POST_SNAPBACK}>

Share this post


Link to post
Share on other sites

No stories. Just addition. They need to add an arm to keep frontage on the street. In short, the new hotel will block their access - they are adding a wing to maintain that access.

Share this post


Link to post
Share on other sites

Will the addition be the same height as the existing building? Will this be the new entrance? I hope they do something nice with it. The rest of the building is unremarkable, especially for riverfront property.

Joe

No stories.  Just addition.  They need to add an arm to keep frontage on the street.  In short, the new hotel will block their access - they are adding a wing to maintain that access.

<{POST_SNAPBACK}>

Share this post


Link to post
Share on other sites

I was driving by the soon-to-be construction site and I noticed that they pulled all of the ornamentation off the Israel's building before demolition begins. Does anyone know who nabbed it? I hope it ends up being reused in another development downtown.

Joe

Share this post


Link to post
Share on other sites

Alticor will submit a revised Helistop plan that will put it on the top of the tower. It will be large enough to land military helicopters on (for visiting dignitaries). The city will be discussing it next week.

Joe

Share this post


Link to post
Share on other sites

And that was so difficult to figure out. Makes a hell of a lot more sense. I sure as hell would not have wanted to land a helicopter at the base, in the middle of buildings and a huge parking ramp.

Share this post


Link to post
Share on other sites

Agreed. People would need to use the skywalks just to make sure they didn't get blown away in the wash of helicopter blades. :)

Joe

And that was so difficult to figure out.  Makes a hell of a lot more sense.  I sure as hell would not have wanted to land a helicopter at the base, in the middle of buildings and a huge parking ramp.

<{POST_SNAPBACK}>

Share this post


Link to post
Share on other sites

I always thought it was going to be at the top of the tower, isn't it common sense?

"John, what do you think of the design? Look here I placed the helistop at near ground level so that people can jump out and not brake their legs!"

Share this post


Link to post
Share on other sites

im guessing that since alticor is pushing this helistop idea that its worth the struggle to get it. i mean is it used that often to make it worthwhile?

Share this post


Link to post
Share on other sites

Your right Metro :) Watch any episode of Alias and you'll see a bunch of helistops on the top of the buildings in L.A. I'm sure they were just trying to take the cheap route with the new Marriott. Probably looked at the low-rise building with nothing on it and though "Hey! This is a cheap easy way to do it".

Joe

SUPES:

Thank you addressing this bit of "still-GR-after-all" with the tone that you did.  Do you see how our pervasive ultra-conservatism bleeds into the consciousness of others - even those that should know better?  OUCH!  The Caprile guys are from CHICAGO!!!  They should be familiar with the concept of HIGHRISE ROOFTOP HELISTOPS  to ISOLATE HELICOPTER SQUALLS AND NOISE away from street pedestrians.  Point-in-case is Los Angeles (maybe it would help to send a copy of INDEPENDENCE DAY to shake off their brush with "GR conservative think" so that they can see the scene where the First Lady is evacuated from LA by way of a proper helistop).  Ever since they proposed the helistop on top of the ballroom structure - ONLY FOUR STORIES FROM THE STREET - I have been doing this ---->  :blink: and saying to myself, "idiots, just put it on top of the tower like the rest of the thinking world".  :whistling:

<{POST_SNAPBACK}>

Share this post


Link to post
Share on other sites

Hotel helistop decision reversed

Friday, May 27, 2005

By Rick Wilson

The Grand Rapids Press

GRAND RAPIDS -- Reversing a decision it made earlier this spring, the Grand Rapids Planning Commission on Thursday approved a "helistop" atop the 24-story Marriott Hotel that Alticor Inc. plans to open downtown by fall 2007.

Share this post


Link to post
Share on other sites

Rizzo,

I read that it was a maximum of 15 flights per month, with a cap of 2 on any one day. Either way it'll be cool to see helicopters landing on top of the Marriott. Maybe we can get a Zepplin landing pad like the Empire State Building. :)

Joe

good! They say they will have 2 flights out of the tower each day...

<{POST_SNAPBACK}>

Share this post


Link to post
Share on other sites

Rizzo,

I read that it was a maximum of 15 flights per month, with a cap of 2 on any one day. Either way it'll be cool to see helicopters landing on top of the Marriott. Maybe we can get a Zepplin landing pad like the Empire State Building. :)

Joe

<{POST_SNAPBACK}>

Yah, that's just what we need :P

Hindenburg_disaster.png

Share this post


Link to post
Share on other sites

I see they have started to take bricks off of the first floor of Israels. Anyone know where they are going to be re-used (other than on a new shed in the Devos Compound) :lol: They would look great on a re-habbed home.

Share this post


Link to post
Share on other sites

"(other than on a new shed in the Devos Compound)"

My dad just got done doing some temp labor for him, he said something about "movement" on the grounds... who knows..

Share this post


Link to post
Share on other sites

When will the progress photos start coming. I'm going to have to make a trip over there soon to see for myself once there is evidence in the ground!

Share this post


Link to post
Share on other sites

It will be a few months. The Amway is doing work on their underground kitchen next to this new building. At the same time, the Riverfront building has to finish their expansion (or the footings at least) before the new hotel can start.

I would guess that this will officially begin about the same time River House begins to go up - this Fall.

Share this post


Link to post