The barricades are being moved back out along Main Street blocking a lane and parking spots like they were originally to prepare for the AC hotel and office/condo building construction. 

Edited by gman430

Share this post


Link to post
Share on other sites


22 hours ago, cabelagent said:

See the apartment structure in the background...is that floor #3 going up?

Nope still working on #2 but looks like #3 should start soon.

  • Thanks 1

Share this post


Link to post
Share on other sites

Has anyone walked down Falls Street next to this? It feels massive already and it still has many floors to go. I think it feels so big due to the length of the building.

enhance

enhance

enhance

  • Like 1
  • Thanks 1

Share this post


Link to post
Share on other sites

21 hours ago, apaladin said:

Thanks for the pics. Any signs of the other buildings starting? Wasn't one supposed to start the end of August or was it September?

No workers were on site today.   Should I be worried? :tw_grin:

Untitled_Panorama1.jpg

Share this post


Link to post
Share on other sites
36 minutes ago, bikeoid said:

No workers were on site today.   Should I be worried? :tw_grin:

Untitled_Panorama1.jpg

Yes. Even more so because it’s a Sunday and a tropical system is blowing through. 

Share this post


Link to post
Share on other sites
1 hour ago, gman430 said:

Yes. Even more so because it’s a Sunday and a tropical system is blowing through. 

Ahh...the 'ole tropical system  on Sunday trick...construction workers always fall for that one.  :tw_glasses:

  • Like 1

Share this post


Link to post
Share on other sites
On 7/28/2018 at 9:26 AM, gman430 said:

Not quite. City hall is only 120 feet tall. Even with the elevation differences, this office/condo building will still be a good bit taller. Expect it to be right around the same height as the TD Bank building and tower crane currently on site. The Greenville News building is 75 feet tall and the apartment building will be 150 feet tall.

 

:yahoo: Update on Camperdown project timeline: https://www.google.com/amp/s/amp.greenvilleonline.com/amp/830112002 AC hotel to start construction in August with office/condo building starting construction in early October. :shades: Completion of project is still late 2019. Three tower cranes on one site...not too shabby. 

Went by today and work has started on the 3rd floor of the apartment building, 4th if you count the retail so it is moving along. Unfortunately and obviously the AC Hotel didn't start in August as stated above and very doubtful the office/condo building will start in October as there is no signs of either getting going. No way this project gets completed in 15 months(end of 2019). :tw_confused:

Share this post


Link to post
Share on other sites
8 hours ago, gman430 said:

No Site grading or building permits have been issued for the hotel yet. 

That's not a good development...know you'll play detective and find out what's happening.  They may be getting prepared in gathering materials to stage construction.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • Recently Browsing   0 members

    No registered users viewing this page.

×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.