Jump to content

5th & Broadway | 501 Commerce | NMAAM | 34 story apt, 26 story office, + 183,000 sq. ft. of Retail


MidTenn1

Recommended Posts


16 hours ago, Sean blackdog said:

These two photos are pretty impressive and show the growing density in our CBD. 

  • Like 2
Link to comment
Share on other sites

Construction resumed after deep cleaning on site after at least 2 construction workers tested positive for Covid-19.

There are now four medics stationed on-site every day. Skanska requires workers to undergo temperature checks before entering the job site, with bracelets issued for those who have been medically cleared to enter. Face coverings and gloves are mandatory, with hand sanitizer available on every floor where work is being performed. On an hourly basis, a full-time subcontractor cleans elevators, stairwells, wash stations and commonly touched surfaces such as doorknobs. Crews from Gallatin-based Servpro Industries Inc. have been doing additional cleaning since early April.

More behind the NBJ paywall here:

https://www.bizjournals.com/nashville/news/2020/05/06/fifth-broadway-construction-resumes-after-worker.html?iana=hpmvp_nsh_news_headline

  • Like 2
  • Thanks 2
Link to comment
Share on other sites

1 hour ago, markhollin said:

Construction resumed after deep cleaning on site after at least 2 construction workers tested positive for Covid-19.

There are now four medics stationed on-site every day. Skanska requires workers to undergo temperature checks before entering the job site, with bracelets issued for those who have been medically cleared to enter. Face coverings and gloves are mandatory, with hand sanitizer available on every floor where work is being performed. On an hourly basis, a full-time subcontractor cleans elevators, stairwells, wash stations and commonly touched surfaces such as doorknobs. Crews from Gallatin-based Servpro Industries Inc. have been doing additional cleaning since early April.

More behind the NBJ paywall here:

https://www.bizjournals.com/nashville/news/2020/05/06/fifth-broadway-construction-resumes-after-worker.html?iana=hpmvp_nsh_news_headline

Gotta be a monumental task to keep everything wiped down.  Not as hard as something like a large retail store...but still very difficult.

  • Like 1
Link to comment
Share on other sites

8 hours ago, Native said:

The excellent picture by downtownresident did have shadows on it, but the screen panels are somewhat different according to which color you look at.  And the fit is not perfect, though much better than what we saw three months ago.  Since I am somewhat obsessed with this issue I am now wondering what is going to be installed on the brackets protruding from the panels near Commerce Street on the west side.  Someday this sucker will be finished and I will have to get another hobby.

The panels in the lower lefthand corner have mounting brackets or studs poking through that go all the way to the top of the garage.

I think the shadows could be really cool with the shadows as the day passes, so I'm excited to see the final product. 

Perhaps we'll get more digital signage on the garage? Seems like it will be very large

  • Thanks 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.