Jump to content

Guest

Nashville Yards, 15 acres/4 million sq. ft./ $1 billion, Phase I: Grand Hyatt Hotel (25 stories), Phase II: Amazon Operation Ctr. (26 & 22 story towers), Phase III: AEG/MGM District (21 story hotel, 4,000 seat theater, etc.); Phase IV: more towers

Recommended Posts

12 minutes ago, titanhog said:

So…it appears they are placing some type of metal “frame” around the elevator shafts.  What do you guys think that means?

It is a good sign. The elevator core has to go up before the floors. 

  • Like 2
  • Haha 1

Share this post


Link to post
Share on other sites


11 hours ago, nashvylle said:

It is a good sign. The elevator core has to go up before the floors. 

Is the metal frame part of how they raise the mold?  I don’t remember if those were on there before and taken off…or if it’s something totally new.  Just trying to decipher if the last couple of times they’ve been using the crane is a sign they’re about to start on tower 2.

Share this post


Link to post
Share on other sites

13 minutes ago, UrbanWes03 said:

I believe this is a new rendering, correct me if I’m wrong though. It’s the newest post on the Nashville Yards Instagram. Are there now plans to have a tall glass building right next to the Grand Hyatt or are these just new concepts?

IG Link: https://www.instagram.com/p/CKXj10VBX-K/?igshid=1iyat7mw4yg0s

That is a new one to me. 

  • Like 4

Share this post


Link to post
Share on other sites

I can’t imagine them filling in that entire space between the Hyatt and Church St with just two large buildings.  They would be really wide, wouldn’t they?

Also…kinda makes me wonder if they just have no clue what’s going to get built on that land now that we’ve gone through this pandemic and they're just throwing up some renders of different buildings as placeholders and “enticers” to anyone interested.  Their Twitter and Instagram still show the old renders with the 600’ Amazon building next to Church.

Edited by titanhog
  • Like 3
  • Sad 1

Share this post


Link to post
Share on other sites

3 minutes ago, downtownresident said:

I measured in the parcel viewer, and the parcel is about 700' from the edge of the Hyatt to Church Street. For comparison's sake, the Grand Hyatt measures about 300' from Broadway to the northern edge of it's parcel, and the Amazon garage about 475' from Church street to the northern edge of the parcel. 

If it ended up being a tall Amazon office building and tall apartment building, that would work great for Amazon.  Have everyone live right next door.

  • Like 1

Share this post


Link to post
Share on other sites
4 minutes ago, LA_TN said:

Hmmmmmm.......

 

 

That right there let's you know they've updated some things without putting any real updates out.

Edited by NashRugger
  • Like 1

Share this post


Link to post
Share on other sites
28 minutes ago, PHofKS said:

I looked again at this rendering and have decided the only change is to the residential tower which is twice as tall  as the original proposal. Behind the residential are the previously shown office towers. Then you have the Amazon towers.

 

I have a picture in my mind of you with one of those watchmakers loupes, studying every millimeter up close until you figured this out. :tw_lol:

  • Haha 2

Share this post


Link to post
Share on other sites
42 minutes ago, PHofKS said:

I looked again at this rendering and have decided the only change is to the residential tower which is twice as tall  as the original proposal. Behind the residential are the previously shown office towers. Then you have the Amazon towers.

 

1456249225_NewNashYardsresidential12021.thumb.jpg.3800391c6e60e440772db8c2a726270d.jpg

I couldn't believe they would build (only) a 21 story residential building downtown, so I'm not surprised if indeed this is a revised proposal.

That is what I was looking at last night Pete, and pretty much came to the same conclusion about the old towers vs the new towers. I will have to say though with the speed that  Amazon Two is taking, this one will like be 4 years down the road minimum. The residential may come sooner than that. 

  • Like 3
  • Thanks 1

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • Recently Browsing   0 members

    No registered users viewing this page.

×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.