Jump to content

Church Street Plaza | 28-Story Office/Hotel [Phase 1 Under Construction]


bic

Recommended Posts


We will be very lucky if that phase two tower gets built. 

Lovely design and it will finish the bottom floor for in-building SunRail station if completed and meets the standard form moving there. . . 

 

I certainly hope so. 

 

I wouldn't hold out for phase III. 

We have Magic Entertainment Complex to compete with, after all. . . 

  • Haha 1
Link to comment
Share on other sites

13 minutes ago, dcluley98 said:

Lincoln bought the whole south side of Curch Street as I have seen reported. 

Hence the name. . . 

 Church Street Plaza when phase I on south street turned into more to the north. 

I believe the only building there that is considered landmark status is the Bumby block. Lincoln could push to demolish the rest of those buildings and I doubt they would get resistance from this administration.  It’s difficult to envision this stretch of Church Street mixed in with a modern generic high rise.

Edited by prahaboheme
Link to comment
Share on other sites

21 minutes ago, dcluley98 said:

We will be very lucky if that phase two tower gets built. 

Lovely design and it will finish the bottom floor for in-building SunRail station if completed and meets the standard form moving there. . . 

 

I certainly hope so. 

 

I wouldn't hold out for phase III. 

We have Magic Entertainment Complex to compete with, after all. . . 

Phase 3 isn't a tower though. It's just a small building I believe. 

60 Sq feet isn't much to be vertical if I'm understanding the location correctly. 

 

Also they applied for demo permits for phase 2 already. Why wouldn't it go through? 

Economy won't crash before 2021 at least. 

Link to comment
Share on other sites

8 hours ago, dcluley98 said:

Mayby Phase III is across the street next to the Fat Conquistador? 

Maybe it will be the narrow strip of land off South St, east of the tracks. I think that is City owned roadway, but perhaps the developer has an option on it. It could hold a very narrow 20,000k sq feet/ floor.

  • Like 1
Link to comment
Share on other sites

27 minutes ago, AmIReal said:

Maybe it will be the narrow strip of land off South St, east of the tracks. I think that is City owned roadway, but perhaps the developer has an option on it. It could hold a very narrow 20,000k sq feet/ floor.

The rendering had building there.   Maybe you're right.

Link to comment
Share on other sites

2 hours ago, AmIReal said:

Maybe it will be the narrow strip of land off South St, east of the tracks. I think that is City owned roadway, but perhaps the developer has an option on it. It could hold a very narrow 20,000k sq feet/ floor.

do you mean east of the tracks, west of Suntrust garage, and south of Church St Depot, and north of South St?

if so, that is very narrow; maybe 3 car lengths in width.

Link to comment
Share on other sites

12 minutes ago, prahaboheme said:

So phase 3 includes Hamburger Mary’s? Does this mean they will lose their lease?

Mary’s is in the old Bumby Hardware building which is landmarked. Of course, we know how little that means to Bulldozer Buddy. If that’s in play, I know I’ll contribute to any lawsuit we can muster.

Edited by spenser1058
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.