The ATX

500 W. 2nd St. | 400' | 28-Stories | Complete

17 posts in this topic

This office tower is part of the large Greenwater development.  It's nickname has become the Google Tower because Google pre-leased a lot of the office space.  Here's a recent photo of the construction progress taken from Zilker Park:  

500%20W%202nd%20St%2006.2016.png

Edited photo by Eric Laczi on Flickr

 

Here's a rendering from the construction contractor's website.

Google%20Tower%20Render.png

Share this post


Link to post
Share on other sites


Here's a view of this project taken from a balcony on the recently completed 30-story Seaholm Residences.  That lot in front of this tower being used for construction staging is the site of the 33-story Austin Proper Hotel & Residences.  The lot to the right of the Austin Proper site that is also being used for construction staging is the site of the ~400' Greenwater Residential #2.  That building to the left of the Austin Proper site is the Austin Music Hall that will be demolished for the 29-story Third + Shoal office tower.  Just to the left of this view is the U/C 58-story Independent condo tower, and behind the Independent is the 459', 39-story Fifth & West condo tower.  This area is going to be dense!

13575980_10154352992508453_3961173959736Link

Share this post


Link to post
Share on other sites

Here's a view of the growing 2nd St. canyon taken from the pool deck of the JW Marriott.  This tower is barely visible on the right side of 2nd St.

JW%20Pool%20Deck.png

Craig Willford on Flickr

 

Share this post


Link to post
Share on other sites

The view in this KevinFromTexas photo was taken from I-35.  The new tallest is going up directly behind this tower from this angle.  In addition to this tower and the new tallest, also going up in this cluster are the Fifth & West, Austin Proper, Third + Shoal and Green Water Residential #2 towers.  Check back in two years and this view will rock.  

6cdM5gf.jpg

Share this post


Link to post
Share on other sites


This is from yesterday.  The excavation going on in front of this tower is for the 29-story Third + Shoal office tower after the Austin Music Hall was demolished.

Ddv2X7a.jpg

Photo by corvairkeith

Share this post


Link to post
Share on other sites

I took this one this weekend.  The power substation in the foreground remained after the former Seaholm power plant site was re-developed.

500%20W.%202nd%20St..jpg 

Share this post


Link to post
Share on other sites

I posted this same photo in the Austin Proper thread because it shows the crane.  But this is an excellent shot of this project.  It's not done yet, but it can't be too far away from being completed. 

32094473134_be0c244ab7_b.jpg

Photo by Urbannizer

Share this post


Link to post
Share on other sites


This project should be officially completed this summer.  The main tenant has their logo by the front door.

AUS2N8b.jpg

Photo by Speculator

 

Share this post


Link to post
Share on other sites

This one is completed according to this Statesman article.  From the article:  

Quote

In downtown Austin, the overall occupancy rate dipped from the first quarter, to 90.2 percent. Cushman & Wakefield said. Much of the increase, however, is due to the opening in May of 500 West 2nd, a new tower with 505,000 square feet of space. Though 95 percent leased, only a few tenants have moved in so far. Google will be leasing more than 200,000 square feet in the building, which CBRE is managing and leasing.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!


Register a new account

Sign in

Already have an account? Sign in here.


Sign In Now

  • Recently Browsing   0 members

    No registered users viewing this page.