What might be a while? Demolition has started (they're blowing out all the external windows and walls).

Before they tear down the building and take down the cell tower.

One set of transceivers has already been installed on the new tower I mentioned earlier in the thread. I imagine the others will be moved or salvaged before the building itself comes down. I would think the internal demolition could take 2-3 weeks anyway, at the rate the windows are currently coming out.

I'd be willing to bet that all the legal stuff with the cell tower has been worked out already, but I don't have any inside info.

Link to comment
Share on other sites

To confirm. Is GVSU retrofitting or building new at this location. I think there is conflicting opinions on this thread. If new, will the site layout generally reflect what is there today?

Brand new building. It was discussed earlier in the thread. I think the general location of the new facility will be in the same spot, but the school has only provided that hazy rendering, no detailed elevations, or site plan. A ground breaking is set of May: http://www.gvsu.edu/giving/l--william-seidman-building-9.htm

A "site celebration" was held last year. I always thought that was the groundbreaking, but I guess not.

Edited by mpchicago
Link to comment
Share on other sites

Before they tear down the building and take down the cell tower.

One set of transceivers has already been installed on the new tower I mentioned earlier in the thread. I imagine the others will be moved or salvaged before the building itself comes down. I would think the internal demolition could take 2-3 weeks anyway, at the rate the windows are currently coming out.

I'd be willing to bet that all the legal stuff with the cell tower has been worked out already, but I don't have any inside info.

I noticed they had two floors of walls blown out on the SE side this afternoon. That was quick work.

The building will be a skeleton by this time next week.

Link to comment
Share on other sites

Generally a carrier that is subleasing a centerline on a tower is provided sufficient notice to remove equipment. The process takes more time to schedule than to complete.

At my last gig, a Wisconsin university provided us notice on March 17 of a building they intended to demolish. For some reason the company's legal department was not consulted ---why have them on payroll if you're not going to use their skills??--- and our equipment was removed, then re-installed atop another campus structure within three months. This represented a super-human effort on the part of my site acquisition consultants; getting a new lease squared away generally took most of a year.

Since the equipment shelters are on this building's roof, I have no way of guessing which carriers are on the tower. (Presumably VZW has already moved off, or powered down its installation if it's to be abandoned. Last I knew, they owned the tower.) When they are on the ground, one can walk up and read the company names on the electric meters.

If you experience a coverage hole in this area, it might be because your carrier is relocating and plugging things in.

"Platform and antennas" in the industry. City of Detroit engineering department: "crow's nest."

Edited by Veloise
Link to comment
Share on other sites

  • 2 weeks later...

There are at least three carriers on that tower. All three are actively working to remove equipment. Interior demolition will progress in the meantime so that the structure can come down as soon as the tower is moved.

The third set of transceivers appears to be almost completely mounted on the new tower to the west. So, I imagine the switchover of service and the dismantling of the old tower could start very quickly. It took a decent amount of crane time to get the new ones up. I could foresee the removal of the old ones, with more difficult crane access, taking a little bit of time. Interior demolition appears to be moving pretty swiftly. All windows are now removed and the inside of parts I could see appear pretty empty.

Link to comment
Share on other sites

  • 3 weeks later...

Unless I'm really not reading those renderings right, it looks like they are going to take down the floodwall along their river frontage?

Looks like the flood wall is still there. It's white with a railing. I like the back of this building along the river better than the front. Not sold on that "tower" feature or the huge parking lot.

Link to comment
Share on other sites

Unless I'm really not reading those renderings right, it looks like they are going to take down the floodwall along their river frontage?

river_view.jpg

If so, then this thing has gone straight to awesome!

Wow, a lot more massive than I thought. Looks good! I wonder why they have those videos on there but they're set on "private?"

The warehouse was getting pummeled today.

Link to comment
Share on other sites

Looks like the flood wall is still there. It's white with a railing. I like the back of this building along the river better than the front. Not sold on that "tower" feature or the huge parking lot.

I agree! The river frontage will be the more visible side to this building, after all. Even with the flood wall, it'll still be pretty awesome.

But yeah, not sold on the sea of parking lots surrounding it. This building will look strange by itself. It needs a neighbor.

Link to comment
Share on other sites

Dusty demolition today.

5783087930_54a99c1a89_b.jpg

5782535629_6100aaed0d_b.jpg

5783090556_e33f57c5e0_b.jpg

5782528079_5dd19f5fa2_b.jpg

It appears in the site plan that this area below the floodwall might get a trail (when the river isn't so high, obviously):

5782530413_15af54b203_b.jpg

5782531789_ae9a4805ec_b.jpg

Time to crack out the sketches of the pedestrian walkway from a couple of years ago...

Ah, here they are:

2347808909_7202f53851_z.jpg?zz=1

2340825518_ac71212bb8_z.jpg?zz=1

And the suspended bridge under the S-curve:

2340777642_24d3404c4f_o.jpg

Link to comment
Share on other sites

  • 2 weeks later...

I was in Allendale today. The foundation is in for the tower crane, and it looks like they've opened a hole in the basement foundation of Kirkhof adjacent to the new library site. I didn't have my camera with me. I'll make sure to have it next time; there was a lot going on out there. The lawn by the pond is all dug up, too.

Link to comment
Share on other sites

  • 2 weeks later...

I'm starting to get seriously worried about the direction Allendale is heading in.

Controversial Allendale student housing plans are blocked.

As far as I know, the only "controversy" surrounding this project exists between the developers and their competition. And the township is being sucked in. This doesn't seem like any way to plan for a successful city at all.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.