Jump to content

gman430

BridgeWay Station mixed use development-Mauldin, SC

Recommended Posts

Woah -- Is this an office building?

14 minutes ago, gman430 said:

It got ummm...taller. Dang site is gonna have a bigger skyline than Greenville upon completion. :lol: 

8FBC50EE-61E1-48D4-88B6-C8CFEE8FA971.jpeg

 

Share this post


Link to post
Share on other sites


25 minutes ago, GvilleSC said:

Woah -- Is this an office building?

 

Yes. The updated leasing package got sent out today. Location of proposed building: 

843EE3AA-D90D-4C5F-9C0E-32901922CCF5.jpeg

Edited by gman430
  • Like 1

Share this post


Link to post
Share on other sites

Interesting...  Based on past experience, I assume that Hughes has the main tenant lined up already. What a shame this isn't going downtown.

Share this post


Link to post
Share on other sites
18 minutes ago, GvilleSC said:

Interesting...  Based on past experience, I assume that Hughes has the main tenant lined up already. What a shame this isn't going downtown.

I don’t believe Hughes has any tenants lined up for this building or the one currently under construction at the development. 

Share this post


Link to post
Share on other sites
6 hours ago, gman430 said:

Yes. The updated leasing package got sent out today. Location of proposed building: 

843EE3AA-D90D-4C5F-9C0E-32901922CCF5.jpeg

This is exciting. Thanks for sharing! Do you have a link to the leasing package, Gman?

Share this post


Link to post
Share on other sites
3 hours ago, Krugerdk said:

This is exciting. Thanks for sharing! Do you have a link to the leasing package, Gman?

I don’t unfortunately. I received it in an email. 

Edited by gman430
  • Like 1

Share this post


Link to post
Share on other sites

At this point I think I have just reached the I don't care stage when it comes to how many floors a building has.  I care far more about good design/layout and making sure the roads around the area can support anything with increased density. For example... Holland Road needs to have at minimum a turn lane added down its full length and Bridges Road from the intersection with Holland needs to be four lanes with a turn all the  up to the the Mauldin High School intersection.  Sadly this will probably not happen until after this is done and the whole area is in gridlock.

  • Like 1

Share this post


Link to post
Share on other sites

Looks like this is on hold due to lack of preleased tenants. Not sure who they expect to land when retailers and restaurants continue to close left and right. 

Share this post


Link to post
Share on other sites

On 1/27/2020 at 4:40 PM, gman430 said:

Looks like this is on hold due to lack of preleased tenants. Not sure who they expect to land when retailers and restaurants continue to close left and right. 

Maybe they are all going to the Mauldin City Center Project. :rolleyes:

Share this post


Link to post
Share on other sites
On 1/27/2020 at 4:40 PM, gman430 said:

Looks like this is on hold due to lack of preleased tenants. Not sure who they expect to land when retailers and restaurants continue to close left and right. 

The decrease in the number of failing retailers and restaurants could shift space for commercial use to office, residential, and entertainment uses.  Dense office and residential development can fill BridgeWay Station quickly.

Share this post


Link to post
Share on other sites

Traveled up 385 this am....did not view any heavy equipment on the site/vicinity as before. Appears construction is paused for a while...

Share this post


Link to post
Share on other sites
12 hours ago, vistatiger said:

Maybe they are all going to the Mauldin City Center Project. :rolleyes:

I have wondered if these two major projects might be too much at once for Mauldin. Mauldin is growing for sure, but these are both large projects to be hapenning at the same time. 

Share this post


Link to post
Share on other sites
19 minutes ago, distortedlogic said:

I have wondered if these two major projects might be too much at once for Mauldin. Mauldin is growing for sure, but these are both large projects to be hapenning at the same time. 

I don't want them to disrupt what's going on in Greenville, specifically downtown. 

  • Like 1

Share this post


Link to post
Share on other sites

Construction equipment started arriving on site today. Does this mean it’s finally moving forward? We shall see.

Edited by gman430

Share this post


Link to post
Share on other sites

No movement on site minus some sewer work which is what that equipment was for. Sad. 

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • Recently Browsing   0 members

    No registered users viewing this page.

×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.