Jump to content

Recommended Posts

Looks like new tax passed for the proposed MoveEBR...an overlap to he unfinished Green Light Plan....also includes Intersection improvements & new Turn-lanes; Drainage; etc....AND "Mobility Features"? & Light Synchronization! 

  Not exactly sure what is in store for So.Flannery Road?  Seeing  "new Sidewalks" for So.Sherwood Forest Blvd.  A New Ardenwood-Lobdell connector...."new Multi-use Path?" for So.Sherwood from I-10 to Old Hammond Hwy...."New Sidewalk"? on Centurion Ave from O'Neal Ln. to Crossbow Dr.?  New Bike Path from College Dr. to Country Club Drive

http://gis.brla.gov/pdf/MovEBR-TaxPlan.pdf

https://www.arcgis.com/apps/MapSeries/index.html?appid=d815ccd0c85642719efef32ac0e127d6

Some of the More Pressing Needs.....

# Widening Old Hammond Hwy to 4 lanes all the way thru to Florida Blvd/Hwy 190.

# 6 Lanes for Airline Hwy North of Florida Blvd Hwy 190 to I-110 &  South to Acsension Parish

# 4 Lane Nicholson (Hwy 30) down to Iberville Parish border

# New 4-Lane Perkins/Picardy Connector....that was part of Green Light Plan II...we new R.R. Underpass & Bridge over Creek

#4 Lane  Pecue Lane

# Jones Creek Road 4 -lane Extension to Airline Hwy

# 6-Lanes for Bluebonnet from Mall of La. to Perkins Rowe; guess the Skywalk will be torn down?

# 4 Lane Lee Drive...REALLY??

#College Drive Enhancements

# Medical Corridor(Health District)   ....new Midway Ave &  Dijon Ave Phase II from Bluebonnet to Midway & Hennessey-Perkins Connector at Kenilworth Pkwy

 

 

 

 

Link to post
Share on other sites

  • Replies 20
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

Someone from Texas A&M must have done the timing.    MoveEBR needs to Movefaster.

Now we find out that "immediately" means 2-3 years. That's pathetic. 

Bluebonnet is crying tears of joy. Sent from my SM-N960U1 using Tapatalk

Posted Images

  • 3 months later...
  • 3 weeks later...
On 12/9/2018 at 1:03 PM, richyb83 said:

# 6 Lanes for Airline Hwy North of Florida Blvd Hwy 190 to I-110 &  South to Acsension Parish

# 4 Lane Nicholson (Hwy 30) down to Iberville Parish border

 

This will be very impactful for the Baton Rouge area.    I only wish that EBR taxpayers weren't footing so much of the bill for what will be a regional impact.   The state should be paying for 90% of both of these projects IMO.   

 

And to clarify, Lee Drive isn't a "widening" project.   It's a "capacity enhancement" project, which likely means a center turn lane and sidewalks, which is about the maximum they could do without negatively impacting the neighborhood.   That will also be a big impact.   

If they actually were able to widen Lee Drive to 4 lanes, College Drive wouldn't be able to handle the downstream traffic flow.   

Edited by cajun
  • Like 1
Link to post
Share on other sites
  • 6 months later...
  • 1 month later...
On 10/30/2019 at 10:00 PM, Antrell Williams said:

Now we find out that "immediately" means 2-3 years. That's pathetic. 

This doesn't make sense. 

They are issuing bonds to borrow against future earnings to pay for this "right now".    It's essentially 30 years worth of infrastructure projects that should happen within 10 years.     The article states "depending on availability of funding" - the whole point of the vote was to alleviate that concern and pull this forward.   

Some of these projects are basically just adding sidewalks and landscaping.   How does that take 36 months to start?   Even the atrocious delay to adding sidewalks to Gardere was only 18 months or so.

Edited by cajun
Link to post
Share on other sites
  • 11 months later...

  • 1 month later...
On 12/17/2020 at 2:14 PM, richyb83 said:

Tired of hitting red lights? Baton Rouge traffic signal upgrades could shorten drive times

https://www.theadvocate.com/baton_rouge/news/article_14a2d1c6-3fbb-11eb-a378-533af21c819e.html

Didn't they do this already a few years back?

Wish something would shorten these development timelines.  Tired of hitting red lights of our state and local  government's ineptitude when it comes to infrastructure.  :(

Link to post
Share on other sites

Yeah the light synchronization is straight up clown world!  Think they finally got it semi-right in downtown area of BR; but the rest of the city?? But they like to talk a lot before something actually gets done!

But seems no matter where i go ....The Woodlands TX ; Gulf Shores AL or Orlando FL....The the traffic light set up sucks!

Edited by richyb83
Link to post
Share on other sites
On 1/19/2021 at 10:04 PM, dan326 said:

Yeah I thought they did, maybe they become unsynchronized like a wound clock or something.

Someone from Texas A&M must have done the timing. 

 

MoveEBR needs to Movefaster.

  • Like 1
  • Haha 2
Link to post
Share on other sites
  • 1 month later...

LOL GOOD STUFFF Cajun!!!!

Wondered it this new roadway would ever get built?  The new Children's Hosp Boulevard would expend from Essen Lane to Bluebonnet Blvd

Fate of Ralph & Kacoo’s property in flux amid MovEBR project

After closing nearly two years ago for an “extensive remodel,” Ralph & Kacoo’s is facing increased pressure to abandon its longtime Baton Rouge location and potentially sell it to the city, which is considering demolishing the building to make room for a new roadway.

A MovEBR project will create a new four-lane roadway from the end of the existing Constantin Drive, near Our Lady of the Lake Children’s Hospital, that will intersect Bluebonnet Boulevard between the Hyatt Hotel and Ralph & Kacoo’s. 

However, a revised Environmental Assessment reflecting an alignment shifted more onto the restaurant’s property is currently pending approval from the Federal Highway Administration. It’s not immediately known when the FHWA will respond to the request.

https://www.businessreport.com/business/fate-of-ralph-kacoos-property-in-flux-amid-movebr-project

Map of Extension

https://movebr.brla.gov/form/constantin-midway-bluebonnet-project-page

 

Link to post
Share on other sites
Yeah the light synchronization is straight up clown world!  Think they finally got it semi-right in downtown area of BR; but the rest of the city?? But they like to talk a lot before something actually gets done!
But seems no matter where i go ....The Woodlands TX ; Gulf Shores AL or Orlando FL....The the traffic light set up sucks!
I think I remember it being a downtown specific project.

Sent from my SM-N960U1 using Tapatalk

Link to post
Share on other sites

Didn't realize they finally Broke Ground " back on Jan 27th...Plenty of work with bridge over Dawson Creek + R.R. Underpass

Bluebonnet Blvd will get some much needed relief btwn Perkins Rowe & I-10

...this Move EBR is another name for Green Light Plan

Mall of La Blvd. (Picardy-Perkins Connector) Project Page

https://movebr.brla.gov/form/mall-of-la-blvd-project-page

 

Link to post
Share on other sites
  • 1 month later...
1 hour ago, Antrell Williams said:

Is it going to be 2 lanes? Thought 4 lanes and sidewalks were supposed to be apart of it?

Sent from my SM-N960U1 using Tapatalk
 

I think you are still correct....says here 4 lanes...& shared path for bikes/pedestrians

My bad .... might be a deceiving  pic.  Will  keep an eye on this

https://movebr.brla.gov/page/picardy-perkins-connector-mall-of-louisiana-blvd-in-construction

picardy-perkins-connector.png

  • Like 1
Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    No registered users viewing this page.

×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.