Jump to content

markhollin

Oracle in Nashville: 3,000 jobs, 800,000 sq. ft. of space

Recommended Posts


If I were them I'd go to One KVB. That building is a show stopper if it ever gets built. And then if they need more space have a 2nd Tower around a block away at the Cummins Station future development. 

Share this post


Link to post
Share on other sites

The jobs announcements have to come in order to fill all the office space currently under construction or we would be in big trouble with a glut of unfilled office space. I am sure a lot of these deals have been in the works for some time. 

Share this post


Link to post
Share on other sites

If they want their operations centralized in one location downtown and are in need of 800,000 sq ft it seems they would need to go to either Highwoods, River North, or maybe have Nashville Yards change the scope of some of their parcels. 

Edited by Ingram

Share this post


Link to post
Share on other sites
Just now, musiczealot said:

Holy moly!

 

Given a normal footprint, how many floors is 800k sq ft in a Class A office building?

30-40 assuming 17K-20K SF floorplates. 

  • Like 2
  • Thanks 1

Share this post


Link to post
Share on other sites

Fantastic news for Nashville no matter the location, however don't expect a one or two tower solution here....big tech traditionally prefers a campus so expect  a River North location or even a miracle that PCS Metals is ready to negotiate a move.

Share this post


Link to post
Share on other sites
Just now, troyboytn said:

Fantastic news for Nashville no matter the location, however don't expect a one or two tower solution here....big tech traditionally prefers a campus so expect  a River North location or even a miracle that PCS Metals is ready to negotiate a move.

Even if PCS Metals moves I imagine that's a decade before anything is ready to be built over there.

Share this post


Link to post
Share on other sites
1 minute ago, DDIG said:

Even if PCS Metals moves I imagine that's a decade before anything is ready to be built over there.

Would definitely be a MAJOR cleanup...youre probably correct.

Share this post


Link to post
Share on other sites

3.5 acres were for sale in lower SoBro where the Division St Connector is

A campus of 10 story buildings would do the trick there and would easily access the interstate/the Gulch/etc

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • Recently Browsing   0 members

    No registered users viewing this page.

×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.