Church Street Plaza | 32-Story Hotel/Apt & Re-work of Former CSS Retail/Event Space [Phases 2/3 Planning Phase]


HankStrong

Recommended Posts


1 hour ago, Uncommon said:

No official timetable. It’s probably going to be in purgatory before it disappears altogether.

 

1 hour ago, Uncommon said:

No official timetable. It’s probably going to be in purgatory before it disappears altogether.

Due to the pan-panic ?

Link to comment
Share on other sites

Yeah, I'm in the "hope it never happens" camp.

At least not as designed.

I would like to see a tower there, but I'd rather see something that incorporates some of the design elements of phase 1.

The proposed design just looks like it's just trying too hard. 

  • Haha 1
Link to comment
Share on other sites

2 hours ago, JFW657 said:

Yeah, I'm in the "hope it never happens" camp.

At least not as designed.

I would like to see a tower there, but I'd rather see something that incorporates some of the design elements of phase 1.

The proposed design just looks like it's just trying too hard. 

Maybe they’ll let Mary be.

  • Like 1
Link to comment
Share on other sites

6 hours ago, Uncommon said:

No official timetable. It’s probably going to be in purgatory before it disappears altogether.

Is phase one fully leased? I wouldn't want to have a large portfolio of office buildings. 

Link to comment
Share on other sites

On 5/15/2020 at 10:52 AM, JFW657 said:

Yeah, I'm in the "hope it never happens" camp.

At least not as designed.

I would like to see a tower there, but I'd rather see something that incorporates some of the design elements of phase 1.

The proposed design just looks like it's just trying too hard. 

I'm still bent out of shape that the garage isn't shared with Phase I.  If the two phases were supposed to incorporate one Sunrail station, they could have done the same for the garage.   Waste or space to have those ramps.

  • Like 3
Link to comment
Share on other sites

3 hours ago, codypet said:

I'm still bent out of shape that the garage isn't shared with Phase I.  If the two phases were supposed to incorporate one Sunrail station, they could have done the same for the garage.   Waste or space to have those ramps.

I'm just guessing here, but from the appearance of the portion enclosed in the yellow box....

chustreplagarage.jpg

....it looks like they might be planning on a future tie-in.  

  • Like 4
Link to comment
Share on other sites

4 hours ago, JFW657 said:

I'm just guessing here, but from the appearance of the portion enclosed in the yellow box....

chustreplagarage.jpg

....it looks like they might be planning on a future tie-in.  

That was my initial impression of Phase 1 too, but Pages 13 &14 of the document below now lead me to believe otherwise or that they changed their mind.

https://orlando.novusagenda.com/AgendaWeb/AttachmentViewer.ashx?AttachmentID=88733&ItemID=49208

Edited by codypet
Link to comment
Share on other sites

1 hour ago, codypet said:

That was my initial impression of Phase 1 too, but Pages 13 &14 of the document below now lead me to believe otherwise or that they changed their mind.

https://orlando.novusagenda.com/AgendaWeb/AttachmentViewer.ashx?AttachmentID=88733&ItemID=49208

Page 22 - the elevation - shows that the facing garage would be without a facade.  I wonder if there is something about the nature of bridging two buildings that would make it move through the permitting process in an advantageous way if they build the buildings separately, and then connect at a later date, or as a change to the plans. 

Link to comment
Share on other sites

6 minutes ago, smileguy said:

Page 22 - the elevation - shows that the facing garage would be without a facade.  I wonder if there is something about the nature of bridging two buildings that would make it move through the permitting process in an advantageous way if they build the buildings separately, and then connect at a later date, or as a change to the plans. 

I noticed that about the South Elevation as well.

That one portion seems to line up with the "unfinished" portion of the north wall of phase one.

OTOH, the floor plans appear to indicate the presence of a wall dividing the two garages though.

Good possibility anyway.

Seems like it would make sense to tie them together unless they are worried about too much crossover traffic.

Link to comment
Share on other sites

1 hour ago, codypet said:

Hmmm you're right about the elevation, but then, why have the ramp in Phase 2 at all as shown on sheets 13-15?  Wouldn't be the first time the floorplan doesn't match an elevation though.

The western area of the garage is flat so they could connect. It reminds me of the garage in lake nona that was built in phases. 

Link to comment
Share on other sites

  • 4 weeks later...
  • 4 months later...
2 minutes ago, spenser1058 said:

I’ll defer to others on that. I’m not a fan of what they’ve been up to so I haven’t been keeping up with it.

I believe Phase 3 was the food hall. I’d imagine they still move forward with that, but not until post pandemic. There’s no foot traffic at all down there right now. 

  • Thanks 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.