Jump to content

PRIME/801 Church St. (38 stories, 456', 358 units, 2,654 sq. ft. retail, 511 capacity garage)


markhollin

Recommended Posts


1 hour ago, MLBrumby said:

That's actually a very nice looking building. IDK if it originally had windows on that side, but it sure fits the building very well. Nashville needs to keep its small collection of prewar masonry 4-8 story buildings. 

Hope they do a nice mural on that wall between the windows.

  • Like 2
Link to comment
Share on other sites

  • 2 weeks later...
  • 1 month later...
  • 2 weeks later...
  • 1 month later...
On 1/4/2021 at 6:08 PM, downtownresident said:

Nothing much new, except for a new layout of the ground floor. All of the retail space has been moved to the corner of 8th/Church and loading moved to 9th. No height on the elevations yet.

07C18501-9477-4BDB-AE62-9342E9B99D47.thumb.jpeg.1c46a2e3535f39813f6bf3ec53ae455b.jpeg

Good to see they flipped the loading to 9th. Having it on Rosa Parks was extremely dumb and would've been a nightmare. 3 Elevators for the parking Structure and than 3 Elevators for the Tower is intertesting. Looking at the graphics of the elevator layouts, it would appear the elevators in the top left of the plan are to serve the residences (separated elevator shaft is possibly the emergency access elevator/service elevator), but then again having both egress stairs in the center of the building makes more sense for serving a tower and giving 360 views to the residences. The other possiblity is the elevators in the top left are for the parking structure and the separated shaft is for the underground parking and the other two are for the above ground parking. 

  • Like 1
  • Thanks 2
Link to comment
Share on other sites

3 minutes ago, Bos2Nash said:

Good to see they flipped the loading to 9th. Having it on Rosa Parks was extremely dumb and would've been a nightmare. 3 Elevators for the parking Structure and than 3 Elevators for the Tower is intertesting. Looking at the graphics of the elevator layouts, it would appear the elevators in the top left of the plan are to serve the residences (separated elevator shaft is possibly the emergency access elevator/service elevator), but then again having both egress stairs in the center of the building makes more sense for serving a tower and giving 360 views to the residences. The other possiblity is the elevators in the top left are for the parking structure and the separated shaft is for the underground parking and the other two are for the above ground parking. 

If this is done like the SoBro is, the elevators at the top left will serve above/underground parking, and the elevators in the center will be for the residential tower. 

  • Like 3
  • Thanks 1
Link to comment
Share on other sites

6 hours ago, smeagolsfree said:

Tony will probably pull the trigger on both of these at the same time. It just takes time to pull all of the moving parts together and a probable laydown lot.

 

Where will the be staging location and construction trailer? I don't think these should be considered 'under construction' until then

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.