IMO the DRB is doing their job.  That is, ensuring projects conform to code and can pass the test of time.  
 

Look, 60 years ago the Cabana Inn and the Travelodge opened at Pine and Main.  The buildings are still there and are still operating as "motels" but are eyesores.   If the Fairfield Inn project is done right, it could last for decades and not be an eyesore.  The last thing we want is a suburban looking motel downtown that won't pass the test of time.  
 

  • Like 1
Link to comment
Share on other sites


The DRB drags out these projects way too long. The Cabana Inn and the Travelodge would still be eyesores if they used a different color brick, a few windows were changed  or the building was set back another 6 feet

from the Street.  The changes the DRB is requiring is wearing out this developer without  significantly improving this project.  I don't understand why they can't approve construction with  a foundation permit and begin

work while fine tuning color choices or small items before a final permit is issued.  Lets not forget that the DRB approved a 10' concrete wall around 2 acres of the AC Marriott parking and a swimming pool on Main St.

They also approved storage containers on Main St. for the Freight yard.  Well we know about that developer and why it was approved with little discussion don't we.......

Link to comment
Share on other sites

On 4/9/2021 at 6:49 PM, Spartan said:

DRB wouldn't have to nitpick if developers would stop proposing poorly designed projects. Charleston Columbia and Greenville seem to get attractive stuff, why not us? 

I dunno, maybe the grass is always greener. I have often talked about many of Spartanburg's developments being better designed and more attractive that most of the projects done in Greenville. Charleston and Asheville as well. You guys are saying your DRB is too picky but I usually think Greenville's isnt picky enough; we've had some real stinkers approved. 

 

Link to comment
Share on other sites

The hotel received final approval at tonight's special meeting.  The developer brought several color options, and the board really liked the one where the black was changed to navy blue and the greys were generally lightened.  IMO, this was the best choice and looks brighter and more cohesive than the other options.  The developers hope to submit for permits in June/July with construction to begin in the Fall.

528697633_ffnavy2.JPG.afcb2fb0435f49d7e04b2fc026d39a86.JPG

There was also a useful explanation of how the approval process is intended to work.  The developer is supposed to get preliminary approval for the massing, general design, etc.  Then they're supposed to go forward with the development process to make sure that design works from an engineering and financing standpoint, before coming back after that with potentially any--usually minor--changes for final approval (and more detailed drawings, material samples, etc).  These developers chose to do the whole approval process prior to final engineering/pricing.  That's a risk, because they must comply with the approved design.  So we have a situation where the applicant didn't follow the intended process.  The DRB worked with what they had, considering that unorthodox choice by the developer.

Hope that clarifies why there was some confusion/awkwardness with this particular review process.

Edited by westsider28
  • Like 2
Link to comment
Share on other sites

  • 2 months later...

I saw a notice in the paper Sunday for a Voluntary Clean-up Contract (VCC) for the "Montgomery Building parking site" (i.e. this future hotel site).  As a reminder, this is a state program that allows a non-responsible party to acquire a contaminated property with liability protection for existing contamination by agreeing to perform an environmental assessment and/or remediation.  I mainly see it as an indication that this project continues to move forward in the background, which is good to see.

Link to comment
Share on other sites

Update on this project from today's H-J (only the first bullet point is newsworthy):

 

  • Spartanburg City Manager Chris Story said the Fairfield Inn & Suites project is underway and they're currently working on electric infrastructure before site work and construction.
  • The city of Spartanburg Design Review Board voted on April 13 to give a five-story Fairfield Inn & Suites slated for St. John Street the green light.
  • The hotel will go up between the George Dean Johnson School of Business and the Montgomery building, a mixed-use high rise that includes restaurants and retailers on the ground floor and apartments above. It’ll be placed in front of a parking garage. 
  • It would be downtown Spartanburg’s third Marriott-owned hotel, joining the 247-room Marriott that was built in 2004 on Daniel Morgan Avenue and the 114-room AC Hotel on W. Main Street that opened in 2016.
Link to comment
Share on other sites

City Council approved first-reading of a development agreement for the Fairfield Inn.  It would be a 10-year FILOT (shorter than most FILOTs) then revert to normal taxing.  In the agreement, the City will provide 140 parking spaces in the St John deck for the hotel.  The hotel is a $20M project and is anticipated to open in 2023.  Below is a rendering version of the final design.

(Side note: Post & Courier Spartanburg is happening soon! It will be great to have higher-quality local coverage!  H-J has been going downhill.)

1845443998_FFfinalrendering.thumb.JPG.63619a053a6d92686eac17938d833453.JPG

  • Like 1
Link to comment
Share on other sites

  • 3 months later...
6 minutes ago, spartanburgh said:

Has anyone heard an update on this project? It has been very quiet for a long time.....

Their FILOT agreement received third and final reading relatively recently at the September 20 County Council meeting, so I presume they only started moving forward in earnest toward construction when that was confirmed.  I'm not worried yet.

(A project in Greer recently got burned by starting before a FILOT got final approval, and the FILOT ended up getting denied.)

  • Like 1
Link to comment
Share on other sites

  • 2 weeks later...
  • 1 month later...

According to this Herald-Journal article, groundbreaking is now scheduled for late Q1 or early Q2.  That's a decent delay from the original plan, but I wouldn't be surprised if it was partially caused by the utility relocation that's necessary before construction can begin.  Duke Energy is notoriously slow with that sort of thing...

  • Like 1
Link to comment
Share on other sites

  • 2 months later...
On 1/4/2022 at 12:39 PM, westsider28 said:

According to this Herald-Journal article, groundbreaking is now scheduled for late Q1 or early Q2.  That's a decent delay from the original plan, but I wouldn't be surprised if it was partially caused by the utility relocation that's necessary before construction can begin.  Duke Energy is notoriously slow with that sort of thing...

I actually saw a Duke Energy SUV on the site yesterday with some engineer looking guys walking around the poles.   Hope that's a positive step for them to get start moving utilities.  Fingers crossed....

  • Like 4
Link to comment
Share on other sites

  • 4 weeks later...
  • 2 weeks later...

The hotel parcel has finally appeared on GIS (originally it was half City parcel, half BF Dev / MB parcel).  It looks like the City sold its portion to BF for $10, then BF sold the combined parcel to DT Spart Lodging LLC for $1.15M.  This was back in October, so I'm not sure why it took so long for the new parcel to show up.  But anyway, seems like another positive step toward construction.

937379472_dtspartsite.thumb.jpg.29ee6455b8170c4b0ad26c29e004b0f3.jpg

I'm also hoping BF will use the sale proceeds toward renovation of the Carolina Theatre...

  • Like 1
Link to comment
Share on other sites

1 hour ago, westsider28 said:

The hotel parcel has finally appeared on GIS (originally it was half City parcel, half BF Dev / MB parcel).  It looks like the City sold its portion to BF for $10, then BF sold the combined parcel to DT Spart Lodging LLC for $1.15M.  This was back in October, so I'm not sure why it took so long for the new parcel to show up.  But anyway, seems like another positive step toward construction.

937379472_dtspartsite.thumb.jpg.29ee6455b8170c4b0ad26c29e004b0f3.jpg

I'm also hoping BF will use the sale proceeds toward renovation of the Carolina Theatre...

Good to see.  I was all excited to see utility work today going on the other day and then it stopped.  Hopefully, it was just preliminary work….

  • Like 2
Link to comment
Share on other sites

  • 2 months later...
On 7/1/2022 at 3:43 PM, hub-city said:

Par grading was at the site Thursday unloading big concrete drain junctions.   Maybe we can see some dirt moving soon.

Photo of drainage work on site.  Hopefully a good sign, and hope we see serious construction work start relatively soon.

PXL_20220703_201818337.thumb.jpg.ff6cd89c7480b355d91a012fa1411bf1.jpg

  • Like 3
Link to comment
Share on other sites

  • 2 weeks later...
  • 1 month later...
  • 2 weeks later...
  • 2 weeks later...
  • 1 month later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.