Alright HardHatGirl, time to pay the piper. Between you and I, what's up with the hotel? If you want we'll change its name kind of like we're talking in code. We can call it "Green Orchid".

Where are you guys at with the drawings 80%? 90%? Giving that up is nothing, I could call Triangle for that. Have you presented a GMP.

Remember its just me and you talking. If you want I'll trade you mine if you trade me yours.

"Green Orchid" :lol: nice. don't exactly need my NSA decoder ring for that.

Edited by pip
Link to comment
Share on other sites

They have just trucked in 4 more crane sections, 2 on each truck, 2 have been placed near the 2nd crane.

Yeah, I saw them too, right under Church St. overpass.

Also, Crane 2 has 2 or more sections added since yesterday, and Crane 1 is, well, tall now.

Link to comment
Share on other sites

Yeah, I saw them too, right under Church St. overpass.

Also, Crane 2 has 2 or more sections added since yesterday, and Crane 1 is, well, tall now.

All the sections for crane 2 were added this morning, it was still the same old one section as of 7:30am this morning when i came into my office 15th floor wachovia bldg central and orange.

Link to comment
Share on other sites

All the sections for crane 2 were added this morning, it was still the same old one section as of 7:30am this morning when i came into my office 15th floor wachovia bldg central and orange.

Do they actually have the crane on top of crane tower 2 or is it just the supports they're building for now?

Edited by bulldogger
Link to comment
Share on other sites

They are currently working on the actual crane (cab) itself, looks like they are getting ready to lift that part up and attach it right now. Maybe they will be done with the 2nd crane or most of it by tomorrow morning.

Do you think they will then raise it to the height of the 1st crane?

I dont know. I haven't seen either of them today so I'm not even sure where the first one is now. If it was me I would take them both higher than where I saw the first one yesterday. This can be an expensive process between crew mobilizations, crane time, etc. You want to minimize the amount of times that you have to do this.

Im gonna go down there tonight to look.

Edited by orlandonative
Link to comment
Share on other sites

Went by today and saw about 4 pieces I think left on the ground. Looks like the north one still will be raised in the coming days.
I noticed the other day from my office window, 7 crane sections sitting next to "stumpy". Right now they are starting to insert those crane tower sections and it looks as if "stumpy" may not be "stumpy" for much longer.
Link to comment
Share on other sites

Crane 2 is still adding sections and it looks about as tall as the North Tower of the Plaza (at least from across Lake Eola).
Well "stubby" has grown up and looks as if he is as tall as his the south crane now, i cant tell from my angle in my office here on the 15th floor wachovia building. from here the north crane seems taller than the south crane now.
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.