City View Phase 3 (Under Construction)


vdogg

Recommended Posts


  • 2 weeks later...

There are actually 2 pile drivers on site now, one in the front of the property and one in the back. It appears that they may plan on building the entire development in one go instead of phases. This makes sense considering the significant delays this project has faced over the years.

Link to comment
Share on other sites

Foundation work is proceeding along the entire site with the first building going vertical. I have changed the name of this thread to reflect the fact that all buildings are being constructed at once. I will be merging all other City View conversation into this thread later. On a side note, the fact that this project is well into construction and I have absolutely NO clue what the final product will look like is ridiculous. The planning process needs to be far more transparent than this. That one water color rendering of 2 Constitution is not going to cut it. The project has obviously been significantly updated and we should be allowed access to what that entails.

  • Like 1
Link to comment
Share on other sites

  • 5 weeks later...

Finally! I’m happy they will still have some ground floor retail/office space. It will be interesting to see if they still intend to build a future hotel now that Hampton Inn (hopefully) comes to fruition.

https://www.loopnet.com/Listing/Two-Constitution-Dr-Virginia-Beach-VA/15420617/

Just now, urbanvb said:

 

Edited by urbanvb
Link to comment
Share on other sites

On 8/14/2020 at 7:46 PM, urbanvb said:

Finally! I’m happy they will still have some ground floor retail/office space. It will be interesting to see if they still intend to build a future hotel now that Hampton Inn (hopefully) comes to fruition.

https://www.loopnet.com/Listing/Two-Constitution-Dr-Virginia-Beach-VA/15420617/

 


There is a steel building being erected right next to this one in the spot where the hotel is planned, so it appears that it is already under construction.

  • Like 1
Link to comment
Share on other sites

  • 3 weeks later...
  • 3 months later...
  • 3 weeks later...
  • 2 weeks later...

This is what it looks like from behind (closest side to VB Blvd), with the "Planned Hotel" in view.  Unless it's been updated, it's interesting that there is supposed to be that parking area and another building right up along the tall treeline.  Hope they leave room for that promised Thalia Creek Greenway that's supposed to go on the other side of those trees.

20210116_163643.jpg

20200131-TCGW Phasing Concept.jpg

  • Like 2
Link to comment
Share on other sites

  • 2 weeks later...
  • 1 month later...

I walked by today. It was a beautiful day to check out construction. Lots of activity for sure. I noticed several construction workers taking the pedestrian bridge to Midtown Apartments. Perhaps they are living there while construction is ongoing.

IMG_20210311_112840.jpg

IMG_20210311_112642.jpg

IMG_20210311_112606.jpg

  • Like 3
Link to comment
Share on other sites

  • 3 weeks later...
  • 1 month later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.