The Blvd Co has started to take reservations on this new project. I have not had the opportunity to look over the plans but I am told the building is modeled after the Poplar.

Share this post


Link to post
Share on other sites


The Blvd Co has started to take reservations on this new project. I have not had the opportunity to look over the plans but I am told the building is modeled after the Poplar.

<{POST_SNAPBACK}>

Isn't that the old folks home?

Share this post


Link to post
Share on other sites

Isn't that the old folks home?

<{POST_SNAPBACK}>

no. it'll be across 10th from the edwin towers building as kind of a sister project to 715 n church. i think the fourth ward neighborhood asked for this to be a shorter, less dense project, but i'm not sure how it turned out.

Share this post


Link to post
Share on other sites

Isn't the meck co tax site the best... having pics of virtually every building in town

Share this post


Link to post
Share on other sites

no.  it'll be across 10th from the edwin towers building as kind of a sister project to 715 n church.  i think the fourth ward neighborhood asked for this to be a shorter, less dense project, but i'm not sure how it turned out.

<{POST_SNAPBACK}>

Yes, that was a particularly nasty Friends of Fourth Ward meeting. People standing up and calling the Blvd Company guys liars and whatnot during their presentation. Apparently there's history between some residents of 715 N Church and BC (715nchurch probably knows what I'm talking about). I wanted to leave the room.

At any rate, they wanted to do five stories, with the tallest facade fronting Church St, then the building stepping down toward the back of the block to lessen the impact on the neighborhood, but said that they may be willing to take it down to four floors. Regardless, the renderings they showed were beautiful. They called it "Collegiate Gothic" and admitted they copied The Poplar and it looked very much like it. Not like a faux version, but like it really was built in the 20's. Hopefully it comes out half as nice.

Share this post


Link to post
Share on other sites


i wish blvd co well on that project... hopefully then they can move on and buy the day's inn and renaissance place and put something worthwhile there.

Share this post


Link to post
Share on other sites

200 W 10th street condos look pretty nice. It is a 4 story l-shaped building with secured parking. A 900 sq ft condo is around 300k. The largest is around 1300 sq ft and is 530k. Kind of wish the building had a rooftop terrace but it doesn't, but condos has small patios.

They seem kind of pricey...good luck to Blvd co...the list I saw had only 3 reserved condos so far

Share this post


Link to post
Share on other sites

200 W 10th street condos look pretty nice. It is a 4 story l-shaped building with secured parking. A 900 sq ft condo is around 300k. The largest is around 1300 sq ft and is 530k. Kind of wish the building had a rooftop terrace but it doesn't, but condos has small patios.

They seem kind of pricey...good luck to Blvd co...the list I saw had only 3 reserved condos so far

OMG! I assume those units come with a maid. I can't see people paying that PSF. Insane.

Share this post


Link to post
Share on other sites

ouch that is high, especially with no full balconies or rooftop terrace.

it does make some sense for the north church street to have high values... but that sounds quite high.

i wonder if now that they are marketing it, and including it on their website that they have refined the pricing more.

Share this post


Link to post
Share on other sites

ouch that is high, especially with no full balconies or rooftop terrace.

it does make some sense for the north church street to have high values... but that sounds quite high.

i wonder if now that they are marketing it, and including it on their website that they have refined the pricing more.

The Boulevard Co. has always, as far as I can tell, been aggressive about their pricing. Their inventory tends to stay on the market longer because of it.

Share this post


Link to post
Share on other sites


530K for 1300sf right there is lunatic pricing in my opinion. Trademark started on the 8th floor for 1312 sf @ 380K. Everything since has been higher.

Share this post


Link to post
Share on other sites

but this is a different market... perhaps the wealthy people like to have a view to the old-folks-home and a shady motel.

Share this post


Link to post
Share on other sites

This is barely more per sq. ft. than 400 N. Church (though I do like the location off 400NC better), and seems to have a little higher grade interior features, most noticebly solid-core doors......this is priced lower than The Ratcliffe, which has worse views. I do believe that N. Church is slowly developing into a luxury address.....something along the lines of Park Ave.....albiet, only a few blocks long. It will be interesting to see if Avenue applies for an address change so that it will be 200 N Church instead of 128 W. 5th.

Share this post


Link to post
Share on other sites

I thought there was a thread for The Boulevard Company's 200 W. Tenth Project, that was supposed to be a 4-5 story mid-rise on N. Church next to 715.....but I can't find it, so I'll post here.

The project is apparantly dead in its current form. TBC withdrew their building permit application and has refiled with the HDC to do a townhouse project at that site instead.

EDIT** Oops, there was a separate thread...moderator please move as you see fit.

Share this post


Link to post
Share on other sites

From what I heard, the original concept wasn't selling too well....it's tough to justify $400 psf for a mid-rise condo building. It is much cheaper to build townhouses, plus probably greater demand in 4th Ward, since there are so many condos announced and no units with "land". I liked the original rendering of this project, but if the do an attractive brownstone style project, then I would be equally as happy....really I just want Reniassance Place across Church St. to be leveled.

Share this post


Link to post
Share on other sites

That whole area has been surprisingly stagnant in the last few years. I'm surprised that nothing has happened with Renaissance Place, or the extra bit of land just north of it.

Share this post


Link to post
Share on other sites

TBC has finally updated their website with this project and it includes the new renderings of the townhouses that they are now buildings.

http://www.theboulevardcompany.com/propert...h_church2.shtml

Click HERE to see a larger rendering in .pdf format. If someone could post it here, that would be splendid.

I like it a lot, though I am concerned that the yellow exterior portions are EIFS....if that is yellow brick, I would be in love.

Share this post


Link to post
Share on other sites

Looks like really good infill. I would have prefered the larger project, but this will create great scale along the street.