The crane is now higher as they "jacked" the crane up today. Glass is also being installed on the residential sections now. If my calculations are correct, the building should be topped out by the end of January.

Share this post


Link to post
Share on other sites


It's easy to picture it now, the only place you can't really see it is from the east, but in a couple of weeks, that will change.

From most other angles it appears to be a great addition and getting better. And I love that glass, the color is different from everything else we have.

RK, you need to come see us.

Share this post


Link to post
Share on other sites

For those who don't know, here is the address for the Viridian Camera:

www.oxblue.com/client/rjgviridian

or

www.viridiannashville.com then click on the crane link.

If you position the camera in the right direction, you can see the hole for the Suntrust Plaza.

Share this post


Link to post
Share on other sites

Wow, that is one good looking color. I think that this will be a rare skyscrpaper that looks better in real life than in the renderings. This will add a lot to Nashville's skyline.

Share this post


Link to post
Share on other sites

Wow, that is one good looking color. I think that this will be a rare skyscrpaper that looks better in real life than in the renderings. This will add a lot to Nashville's skyline.

Looking at the Viridian webcam, I can see the glass on the first residential level. However I can't see the vivid green color that was depicted for the Viridian on the Signature Tower website. Is it really as green as shown below?