Archived

This topic is now archived and is closed to further replies.

TheGerbil

West End Bridge design selected

3 posts in this topic


When I read this Gerbil I was encouraged by the fact that they picked a design that kept it simple and used nature as much as possible for the portals on both ends. Too bad there is no ETA on this, could take another 5-10 years to complete, but glad the ball is rollling some.

Share this post


Link to post
Share on other sites

why are they putting walkways on both sides? That means there will be 4 ways to get over the bridge on foot/bike (new walkway on both sides plus existing sidewalk on both sides). I would like to see one side sacrificed in order to advance the project as quickly as possible. Or build both sides and expand the driving deck to create a barrier between traffic directions. I'm not gonna lie, I get scared driving across that bridge (same with the Liberty, I know people who have been seriously hurt in head on collisions there)

Share this post


Link to post
Share on other sites

  • Recently Browsing   0 members

    No registered users viewing this page.