There will never be an interstate on this corridor, as it is really too redundant with the current 85-40 corridor that has received a lot of capacity attention in the last 15 years. But if you are going to southern Raleigh, the 49-64 corridor is a decent rural route, and most of the areas that need bypasses (Asheboro) have been programmed to get those eventually.

Regardless, spending tens of billions to build a redundant freeway to shave 25 miles off the current route, is just never going to happen.

Link to comment
Share on other sites


There will never be an interstate on this corridor, as it is really too redundant with the current 85-40 corridor that has received a lot of capacity attention in the last 15 years. But if you are going to southern Raleigh, the 49-64 corridor is a decent rural route, and most of the areas that need bypasses (Asheboro) have been programmed to get those eventually.

Regardless, spending tens of billions to build a redundant freeway to shave 25 miles off the current route, is just never going to happen.

Agreed. I make the drive from Charlotte to Raleigh regularly and always take 49/64, mostly because I so disdain interstate driving and like driving low-key country roads. The amount of time it takes versus 85 to 40 or 85 to 64 is practically identical, and I never hit traffic, so I can't see this being anywhere near necessary just to make a 2.5 hour drive 2.

Having taken the 24/27/1 route only once I can't really speak to its congestion, but I had about the same experience with that one time.

Edited by nonillogical
Link to comment
Share on other sites

Regardless, spending tens of billions to build a redundant freeway to shave 25 miles off the current route, is just never going to happen.

True, it shouldn't happen. But then why is there even a I-73/74 going through Asheboro? Talk about a waste of money. Still, if NC can have 3-plus north-south expressways, then just 2 east-west shouldn't be too far-fetched.

Link to comment
Share on other sites

The 73/74 routing were messes, but at least it is in't really redundant, although it would have been nice for it to have followed 77 farther south to Charlotte and be used for funding the US74 upgrade to the coast. But that would have violated the #1 policy of NCDOT: Everything must go through Greensboro.

Link to comment
Share on other sites

  • 2 weeks later...

I drive 77 to work everyday. Our police officers need to do a better job enforcing restrictions on the HOV lanes. I actually watched a lone guy in an sedan pass a trooper in the HOV lane on Friday. Not to mention the constant abuse it sees during heavy traffic.

I will be glad once they turn that lane into a toll lane. I wonder if it will be sectioned off from the rest of the road since it will be toll only. I agree that the HOV lanes gets A LOT of abuse. People use it just to go around others they perceive as driving slow.....and driving at 70 or 75 isn't slow.....

Link to comment
Share on other sites

These new interchanges are being constructed at Poplar Tent Rd. and N.C. 73 (Davidson Highway) along I-85 in Concord. They're part of the I-85 widening project. The interchange shown in the video I posted is at N.C. 73, near the Concord International Business Park.

Also another

of that same interchange, except from an aerial perspective using google maps. The video also shows 2030 peak-hour traffic. After looking at these animations, I didn't realize the new interchange would require two bridges. From looking at the NCDOT plans I thought that it would be just one wide bridge. Edited by NCMike1990
  • Like 1
Link to comment
Share on other sites

Looks like construction on the Shelby Bypass starts this December. The Bypass will be built in segments, and won't be completed in its entirety until 2030:

http://www.shelbysta...der-way-1.34390

Just wondering, but if this road was built as a toll road, like the Monroe Bypass, would the completion of the road happen much sooner than 2030?

Link to comment
Share on other sites

Looks like construction on the Shelby Bypass starts this December. The Bypass will be built in segments, and won't be completed in its entirety until 2030:

http://www.shelbysta...der-way-1.34390

Just wondering, but if this road was built as a toll road, like the Monroe Bypass, would the completion of the road happen much sooner than 2030?

It has actually been delayed until February to "balance project lettings," but that's trivial at this point.

I wonder about the actual likelihood of it taking 17 years to construct. I think once a project is finally started, it is more likely to have funding earmarked and rolled that way in the upcoming TIPs (if the right people make their voices heard).

Edited by cowboy_wilhelm
Link to comment
Share on other sites

  • 2 weeks later...

Looks like construction on the Shelby Bypass starts this December. The Bypass will be built in segments, and won't be completed in its entirety until 2030:

http://www.shelbysta...der-way-1.34390

Just wondering, but if this road was built as a toll road, like the Monroe Bypass, would the completion of the road happen much sooner than 2030?

I really wish they would just delay the project indefinitely. Granted the bypass would be a good thing for me (I live about 10 minutes from where it crosses 18), but the state is building like 20 miles of freeway just to eliminate 10 stoplights. I would even support changing those stop lights to overpasses if it cost more, solely due to long term cost savings from fewer miles of road maintence needed.

Link to comment
Share on other sites

The problem with Shelby - not unlike Monroe - is that 74 is virtually the only way to move east-west in that town. So you get all the thru-traffic like truckers (and myself) combining with the local population that is going to Walmart or Cleveland Mall. To this day, the worst congestion I've experienced in North Carolina is on that stretch of 74.

Of course, one alternate to a full bypass would be better connectivity within Shelby itself so locals aren't forced onto 74 to go anywhere.

Link to comment
Share on other sites

An update on I-85 construction in Concord: The newly paved south bound lanes have road markings and reflectors. Also, the south-facing ramp from the temporary overpass is being demolished. The north-facing ramp is still intact.

it looks like a portion of south bound I-85 will shift to the new lanes starting tomorrow night.

http://www.charlotteobserver.com/2012/11/13/3662764/traffic-shift-planned-for-i-85.html

Link to comment
Share on other sites

Another update on the Monroe Bypass, and it still doesn't look good. It also looks like a massive future research park, one that could rival the RTP, could also be killed off if this bypass doesn't get built. I really do hope something gets worked out by sometime in 2013, and that work can get started on this road. It would also be great to also have another research institute in the Charlotte metro area.

http://www.charlotte...t-turnpike.html

Link to comment
Share on other sites

Another update on the Monroe Bypass, and it still doesn't look good. It also looks like a massive future research park, one that could rival the RTP,.

Ummm, I may have misread the article but it looked to me that "Project Legacy" is an industrial (not research) park. While I would love to see 20,000 new jobs in Union and Anson counties, typical rural industrial park jobs are in the sub $20 per hour range. Rural industrial parks are also notoriously difficult to fill since there is very little to distinguish one area from another (why would a manfacturer pick Union county over upstate SC).

The loss of the Monroe bypass might be mournable, but lets be clear. The real loss in is connectivity between Wilmington and Charlotte, not local development opportunities.

  • Like 1
Link to comment
Share on other sites

I agree, but hopefully this would be a lesson for pretty much lying on the environmental assessment. It is clearly not just a box to check off while we do whatever we want, it is to make sure a large project does not seriously damage an area. Perhaps we will be better off in the long run if they upgrade the current 74 corridor instead of a greenfield corridor that apparently encourages placeless sprawl.

Link to comment
Share on other sites

  • 3 weeks later...

CDOT has some info about the Uptown Loop Study and I don't think anyone has posted any new information on it and it has been out there for a few months. It's quite interesting that it plans to close and revamp some exits and reconstruct the John Belk interchange with I-77. I think the best part is the partial reconstruction of the John Belk/I-77 interchange that includes a flyover for I-277 to southbound I-77.

 

http://charmeck.org/city/charlotte/Transportation/PlansProjects/Pages/Uptown%20Loop%20Study.aspx

  • Like 1
Link to comment
Share on other sites

CDOT has some info about the Uptown Loop Study and I don't think anyone has posted any new information on it and it has been out there for a few months. It's quite interesting that it plans to close and revamp some exits and reconstruct the John Belk interchange with I-77. I think the best part is the partial reconstruction of the John Belk/I-77 interchange that includes a flyover for I-277 to southbound I-77.

 

http://charmeck.org/city/charlotte/Transportation/PlansProjects/Pages/Uptown%20Loop%20Study.aspx

 

When is this supposed to take place.....2025? lol

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.