[Ashland] Waterfront Project

2 posts in this topic

Work delayed on train depot

The second story is too small to be much use, and isn't really that accessible. IMO, the ceiling on the first floor should be removed and it should serve as a nice two-story atrium!

Article information: "Work delayed on train depot, By ALLEN BLAIR, Independent [Ashland], February 3, 2007"

Share this post


Link to post
Share on other sites


Well to note, work has begun on the infill project. Debris from an old Wal-Mart is being used to extend the shore line by ~10 feet into the Ohio River, basically reclaiming land lost over the years from dredging and from the dam system.

Share this post


Link to post
Share on other sites