Ally Charlotte Center (f/k/a Tryon Place) - 26 floors - 427'

Recommended Posts


^Looking at this picture, this thing is clearly not topped out which confuses me because it’s supposed to be 25/26 floors (no 13th) so maybe someone else can explain or count better than me. 

Share this post


Link to post
Share on other sites
1 hour ago, Crucial_Infra said:

^Looking at this picture, this thing is clearly not topped out which confuses me because it’s supposed to be 25/26 floors (no 13th) so maybe someone else can explain or count better than me. 

I think there is one actual office floor still left possibly.  I count 25 floors no mater which way I count so that means 26 total which is the plan.  Remove 13 that gets to 27 floors which is also the published number. 

Edited by navigator319

Share this post


Link to post
Share on other sites

14 minutes ago, navigator319 said:

I think there is one actual office floor still left possibly.  I count 25 floors no mater which way I count so that means 26 total which is the plan.  Remove 13 that gets to 27 floors which is also the published number. 

Still not sure what I’m missing. Look at the rendering. I count 25 floors. Which is where they are now. Yet, it appears they are adding an entire new floor. Last week I assumed that was the hat bracketing based on the rendering. Maybe @ricky_davis_fan_21 can explain? 

Share this post


Link to post
Share on other sites
34 minutes ago, Crucial_Infra said:

Still not sure what I’m missing. Look at the rendering. I count 25 floors. Which is where they are now. Yet, it appears they are adding an entire new floor. Last week I assumed that was the hat bracketing based on the rendering. Maybe @ricky_davis_fan_21 can explain? 

I believe its a continuation of the sheer core/elevator shaft. I would imagine service elevator would have roof access for A/C repair. 

  • Thanks 1

Share this post


Link to post
Share on other sites
1 minute ago, ricky_davis_fan_21 said:

I believe its a continuation of the sheer core/elevator shaft. I would imagine service elevator would have roof access for A/C repair. 

Thank you. That makes sense and now I’m no longer losing my mind. So we can now say again that it’s pretty much topped out (save for the hat and the final core shaft). 

Share this post


Link to post
Share on other sites
6 minutes ago, Crucial_Infra said:

Thank you. That makes sense and now I’m no longer losing my mind. So we can now say again that it’s pretty much topped out (save for the hat and the final core shaft). 

I think so, but I emailed Crescent.

  • Thanks 1

Share this post


Link to post
Share on other sites

2 hours ago, JorgiPorgi said:

Something seems suspicious. I know this could be an elevator shaft- but is the decorative top supposed to be 2-3 floors tall? Or are we getting a surprise RSA Battle House Tower spire added to the top? Hmmm. 

 

6C5C0AA6-71E9-485E-9C0C-071270EA84F6.jpeg

C7444BC1-E06D-416F-A16B-719F0CA60B44.jpeg

It’s totally wack and definitely adds the height of two stories. Makes me wonder if part of it isn’t temporary. If it’s permanent it’s going to be visible over the hat for sure.  

Hopefully @ricky_davis_fan_21 will hear back from Crescent  soon as to what exactly it is. Fingers crossed it’s additional floor/s. 

  • Like 1

Share this post


Link to post
Share on other sites

It’s what I expected, the service elevator stops on the roof, which is pretty unique for Charlotte. So the “Ally Hat” will be just as tall.

 

 

Sent from my iPhone using Tapatalk

 

  • Like 1
  • Thanks 1

Share this post


Link to post
Share on other sites
23 hours ago, ricky_davis_fan_21 said:

It’s what I expected, the service elevator stops on the roof, which is pretty unique for Charlotte. So the “Ally Hat” will be just as tall.

Now I really want there to be a prohibition bar up there "you have to go through the service entrance"

Share this post


Link to post
Share on other sites
4 minutes ago, tozmervo said:

Now I really want there to be a prohibition bar up there "you have to go through the service entrance"

Don't worry, I'll make it happen.

  • Haha 2

Share this post


Link to post
Share on other sites

I'm not thrilled about the extra elevator shaft not being fully hidden by the hat screening.  Another bait and switch by Crescent in their renders. :tw_triumph:

Share this post


Link to post
Share on other sites
1 hour ago, navigator319 said:

I'm not thrilled about the extra elevator shaft not being fully hidden by the hat screening.  Another bait and switch by Crescent in their renders. :tw_triumph:

It'll be much better hidden than the chiller at 300 South Tryon, and people have stopped complaining about that. It would be visible in none of the renderings that they have shown, except for the one that is just barely from a Birdseye, and its visible in that render.

image.png

Edited by ricky_davis_fan_21
  • Like 3

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • Recently Browsing   1 member

×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.