BC Central HS Renovation

8 posts in this topic

Sorry these are dark, I took them as it was getting late.

centralre1.jpg

New Windows on the 1st and 2nd. The 3rd floor infill has yet to be removed

centralre2.jpg

Zoomout

centralre3.jpg

Note the dark red brick on the columns on the third level. This is what the brick will look like on the entire structure when everything is cleaned.

centralre4.jpg

Removed infill panels.

centralre5.jpg

Tower restoration

centralre6.jpg

New Windows on 1st and 2nd

centralre7.jpg

Work progresses on the interior.

centralre8.jpg

Share this post


Link to post
Share on other sites


It is nice to see that they are finally doing some work at my alma mater.

Where was that last picture taken at? If I am thinking correctly the door way on the left leads to the hall way by the auditorium.

Share this post


Link to post
Share on other sites

Cool. Those new windows are a huge improvement. Is that school closed for the year or something? Or just part of the school?

Share this post


Link to post
Share on other sites

Nope, my brother is going to school there and they are supposed to be opening at the same time as all the other schools.

Share this post


Link to post
Share on other sites

Really? It doesnt look like the interior work is done, and they only have around a week to finish it.

Share this post


Link to post
Share on other sites

Yes, but we do not know when wolverine took the pictures though. I will take a drive by there today and see if it looks any different then the pictures that he took.

Share this post


Link to post
Share on other sites

Drove by there today, and it does not look any different from the pictures that he took.

Share this post


Link to post
Share on other sites

School will start on the normal date scheduled, finished or not.