wolverine

Stalled Projects Roundup

10 posts in this topic

Looks like the Arlington Shops have stalled on Washtenaw Ave because one of the developers died

Upland Green, which is nearly finished has halted as well,

http://arborupdate.com/article/1573/whats-...d-green#comment

Demolition work was done over the summer at Glen Ann, but no work has progressed. Their fence was knocked down yesterday as well.

The Gallery site still has a heavily damaged church, no work progressed other than stripping important details off the building, and letting the site look like a mess.

Kingsley Lane returned from an excavated site to a grass site. Construction fence is gone, currently a grass lot.

Share this post


Link to post
Share on other sites


It appears that the very rough economy and housing market is even hitting and hurting the always strong Ann Arbor market. Ouch.

Share this post


Link to post
Share on other sites

Drove by the Upland site Tuesday. noooobody around, worksite gates wide open

up1.jpg

up2.jpg

up3.jpg

up4.jpg

up5.jpg

up6.jpg

up7.jpg

up8.jpg

up9.jpg

up10.jpg

Share this post


Link to post
Share on other sites

That is a shame since it is so close to being completed or at least the outside. I imagine that the weather is not going to be kind if they leave it for the entire winter. Unfortunately I did not get a good look at it when I drove past there tonight since it took all of my concentration to keep the road on the car as the snow blew all over the road.

Share this post


Link to post
Share on other sites

Good find. I was wondering about that the other day.

BTW, Upland Green is now completed. A Panera has opened on the ground floor. I'm really happy with Upland Green, and I hope to see more projects like it within close proximity to North Campus. With that new mega-student housing development nearby, it makes perfect sense to densify

Share this post


Link to post
Share on other sites

They were handing out free cookies on North Campus the day Panera opened. They were warm and somewhat melty. ^_^

Share this post


Link to post
Share on other sites

Someone told me today that the Arlington Shops lot was foreclosed on by Comerica. Does not seem likely that anything will happen with that spot for awhile.

Share this post


Link to post
Share on other sites


Not surprised about that project. It's been stalling for quite some time.

Some more bad news. The project to tear down and rebuild the downtown library has been suspended. Because of these economic times, the AADL board voted to suspend the project for the time being.

Share this post


Link to post
Share on other sites

I've been meaning to ask if anyone knows what is going on with the Tierra on Ashley, the ultra-green building proposed for 200 Ashley? To me, this is easily one of the most exciting landmark proposals for anywhere in Michigan. Last I heard they were preparing for a May construction start, but I haven't heard a thing since.

Share this post


Link to post
Share on other sites