Jump to content

Nashville College & University Expansion


smeagolsfree

Recommended Posts

  • 1 year later...

MTSU's new science building is open for business.

 

 

The student services building was also opened last spring including a walk way to the new student union building. Inside the student services building is also a food pantry open to all students with need.

 

 

Here are some photos of MTSU and the city of Murfreesboro's new indoor tennis court arena currently under construction. The facility is located at Old Fort Park and will boast 8 new courts, lockerrooms, press, and concessions.

 

https://www.dropbox.com/s/t5lfzx2lwjgfb9g/2014-10-20%2017.02.49.jpg?dl=0

 

https://www.dropbox.com/s/45frbnt0fxeev2f/2014-10-20%2017.02.54.jpg?dl=0

 

https://www.dropbox.com/s/arulwkzpcwyepf8/2014-10-20%2017.03.14.jpg?dl=0

Edited by Justiceham
  • Like 1
Link to comment
Share on other sites

  • 2 weeks later...
  • 7 months later...
  • 3 weeks later...
  • 3 months later...
  • 2 weeks later...
  • 2 weeks later...
On 12/12/2015 at 0:01 PM, smeagolsfree said:

I do not recall it this one was ever posted. I did a rare drive into Green Hills and saw this one under construction.

I had not included on the project list.

-McFarland Science Building

http://i.imgur.com/knI4o5A.jpg

I just never thought anything about it or that anyone might have cared about it for it to be posted.  It's a great looking addition to the neighborhood just south of the Lipscomb's rather recently built School of Pharmacy and fronting Belmont Blvd at the beginning of the street that I live on. -==-

  • Like 1
Link to comment
Share on other sites

  • 2 months later...

Middle Tennessee Boulevard from Greenland Drive to East Main Street has begun construction. The street will be widened with new landscaping, planters, sidewalks, bike lanes, MTSU brick and mortar signage, and new aligned and signalized intersections. A new parking garage will begin construction later this year along with the project in the current Bell Street lot.

MTSU has released updated construction and expansion plans for the west side of campus including a new Lytle Street entrance, Performing Arts Center, new building for the College of Behavioral and Health Sciences, an expanded Floyd Stadium, and a new indoor football facility. Renovations are also taking place for Peck Hall, the James Union Building, and new street improvements in adjacent parking lots. In addition, the university plans to demolish the Womack Lane apartments for four new student housing developments, adding an additional 1,000 rooms.

http://www.dnj.com/story/news/2016/02/23/mtsu-plan-proposed-floyd-renovations-new-arts-center/80794394/

  • Like 2
Link to comment
Share on other sites

On 12/18/2015 at 0:16 PM, CenterHill said:

Looks very...Lipscomb-ish.  

..and so I better takes some more photos of my foundation and walls, before the blasting starts again.  That's the way it was with next-door McFarland and Hughes Cntr's.

Edited by rookzie
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.