bic

Dr. P Phillips Orlando Performing Arts Center [Phase 2 Under Construction]

Recommended Posts


metal93    205

I think it should all just be kept in a single thread, all that has to be done is modify the title of this thread, change the bracketed portion to [Phase 2 under construction].

  • Like 1

Share this post


Link to post
Share on other sites
orange87    98
33 minutes ago, metal93 said:

I think it should all just be kept in a single thread, all that has to be done is modify the title of this thread, change the bracketed portion to [Phase 2 under construction].

I agree. No need to make a whole new thread. After all, this is still the same building. They're just finishing it with phase two. Technically the building is still not completed right now.

Edited by orange87

Share this post


Link to post
Share on other sites
jrs2    380

drove by there.  their basement is pretty deep.  the original depth they dug to has doubled in depth the past few months; it steps down.

Share this post


Link to post
Share on other sites
smileguy    334
5 hours ago, jrs2 said:

drove by there.  their basement is pretty deep.  the original depth they dug to has doubled in depth the past few months; it steps down.

I searched for the section view drawings, and can't come up with them.  If I remember correctly (going back almost a decade now) there is a mechanism to store seating under the floor of the space when it converts to a flat-floor configuration. That may be what the extra depth is for.

  • Like 2

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


  • Recently Browsing   0 members

    No registered users viewing this page.