Jump to content

Enfields Obama List


The Voice of Reason

Recommended Posts

Enfield has a decent list going.

I bolded a few items that I like. the best one being the train station of course

CityStateProgramProject DescriptionFunding RequiredJobs

EnfieldCTCDBGAngelo Lamagna Activity Center Pool Replacement-Replacement of 35 year old outdoor public swimming pool located in community revitalization area, with zero depth entry pool.1,800,000

EnfieldCTCDBGHiggins School Renovations-Renovation of former school building to house child development center, school administrative offices, and classroom space for the community college7,000,000

EnfieldCTCDBGNorth Main Street Streetscape Improvements-Streetscape improvements to support the Revitalization of Thompsonville.250,000

EnfieldCTCDBGRecreational Soccer Fields Expansion-Construction of a total of Six (6) Recreational Soccer Fields with parking facilities by expanding to two (2) new locations1,400,000

EnfieldCTCDBGStrand Theater Renovation-Renovation of vacant and deteriorated 1937-built theater in revitalization area for community performance center.3,500,000

EnfieldCTCDBGVillage Center Exterior Rehabilitation-Rehabilitation of exterior of 1890 building Village Center located in community revitalization area. 400,000

EnfieldCTEnergyEnrico Fermi High School Heating & Cooling Plant Energy Efficiency Conversion-Conversion of Heating & Cooling Plant to Energy Efficient System1,400,000

EnfieldCTEnergyWPC Co-Generation-To up grade the Town�s Water Pollution Control Facility to begin generating our own power by utilizing the existing sludge9,500,000

EnfieldCTPublic SafetyPublic Safety Communications System Upgrade-Replacement of Town-wide radio system with trunked system and computer aided dispatch.6,500,000

EnfieldCTSchoolsEnfield High School Fire Line Extension-Extension of exterior fire line to replace failed line under building.350,000

EnfieldCTSchoolsSecondary Schools Parking Lot Improvements-Reconstruction of the three secondary school parking lots, with improved drainage and traffic flow1,000,000

EnfieldCTStreets/RoadsBeverly Street Reconstruction. Reconstruction of Beverly Street including sidewalks and drainage250,000

EnfieldCTStreets/RoadsFreshwater Blvd. and Cranbrook Blvd. Intersection Improvements. Installation of improved signalization and protected left turn lane to reduce high incidence of accidents.352,000

EnfieldCTStreets/RoadsHazardville Avenue (State Route 190) Sidewalk Extension. Installation of 2500 feet of sidewalk connecting shopping areas to neighborhoods150,000

EnfieldCTStreets/RoadsParker Street Storm Drainage Improvements-Reconstruction of the undersized Parker Street drainage outfall100,000

EnfieldCTStreets/RoadsPowder Hill Road Drainage Improvements-Installation of a drainage system to avert roadway flooding and icing.200,000

EnfieldCTStreets/RoadsRoad 2009 Street Reconstruction. Reconstruction of 8 miles of local streets in accordance with road management system plan13,500,000

EnfieldCTStreets/RoadsTown Farm Road Sidewalk-Install sidewalks in the area of Town Farm Road to provide safe pedestrian access to Town Residence.450,000

EnfieldCTTransitTransit Center Construction. Redevelopment of former site of train station for multi-modal facilityalong New Haven to Springfield communter rail line10,000,000

EnfieldCTWaterInflow & Infiltration-Eliminating the Inflow & Infiltration of the sanitary sewers in the Thompsonville section of Town. During a rain event the effluent treated at the Water Pollution Control Plant increases by 50% 1,100,000

Totals:$59,202,000.00

Link to comment
Share on other sites


  • Replies 0
  • Created
  • Last Reply

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site you agree to our Terms of Use and Privacy Policy. We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.