Site is fenced off.

This will be fun to watch, with a great vantage point. FWIW, I'm not sure what the parking study said about the Fulton/Ottawa ramp occupancy rate but I had to go to almost the top floor to find a parking space today. 

Call this "Before"

22386307266_986413e856_b.jpg

 

  • Like 1

Share this post


Link to post
Share on other sites

 

This will be fun to watch, with a great vantage point. FWIW, I'm not sure what the parking study said about the Fulton/Ottawa ramp occupancy rate but I had to go to almost the top floor to find a parking space today. 

Call this "Before"

22386307266_986413e856_b.jpg

 

We have opposite vantage points. Should be fun.

  • Like 1

Share this post


Link to post
Share on other sites

This will be fun to watch, with a great vantage point. FWIW, I'm not sure what the parking study said about the Fulton/Ottawa ramp occupancy rate but I had to go to almost the top floor to find a parking space today. 

Call this "Before"

 

I touched on that in another thread.  When they proposed this project there were hundreds of open spots.  Arena Place caused a lot of them to get scooped up.  If Spectrum's request for their move to 25 Ottawa is filled, the ramp will be at capacity.  The skywalk to that ramp will be completely worthless unless they can use that 5PM to 7AM pass.  All of the tenants will have to park at Campau.  I don't if this is going to be a huge problem, but I honestly can't see how it does not affect rents on the pro forma. On the other hand, it's possible they haven't figured this out yet and the heart attack is yet to happen.  But I can't imagine the developer doesn't know by now... I would be doing an emergency rework to put a ramp under it, but who knows how long that would take... 

Edited by x99

Share this post


Link to post
Share on other sites

 

I touched on that in another thread.  When they proposed this project there were hundreds of open spots.  Arena Place caused a lot of them to get scooped up.  If Spectrum's request for their move to 25 Ottawa is filled, the ramp will be at capacity.  The skywalk to that ramp will be completely worthless unless they can use that 5PM to 7AM pass.  All of the tenants will have to park at Campau.  I don't if this is going to be a huge problem, but I honestly can't see how it does not affect rents on the pro forma. On the other hand, it's possible they haven't figured this out yet and the heart attack is yet to happen.  But I can't imagine the developer doesn't know by now... I would be doing an emergency rework to put a ramp under it, but who knows how long that would take... 

The skywalk is gone in the latest rendering. At least I think that is the latest rendering. There have been so many...

Share this post


Link to post
Share on other sites

The skywalk is gone in the latest rendering. At least I think that is the latest rendering. There have been so many...

I think when the height of a building does not exceed the width, then it loses the ability to call itself a "tower." :)

  • Like 2

Share this post


Link to post
Share on other sites

I mean, there is a new bulldozer on site now, and some of the parking lot is torn up. Yay?

It is fun to finally see something being done after all these years. Just talking smack. 

Share this post


Link to post
Share on other sites

I went to get some updated pictures of this and nothing has changed from before (all the parking islands have been torn up, but that's it). 

Wonder why this thing goes in so many fits and starts? 

Share this post


Link to post
Share on other sites
13 hours ago, GRDadof3 said:

I went to get some updated pictures of this and nothing has changed from before (all the parking islands have been torn up, but that's it). 

Wonder why this thing goes in so many fits and starts? 

I was wondering this myself. What's the holdup?

Share this post


Link to post
Share on other sites

8 hours ago, MJLO said:

Maybe the are changing the tower to 6 floors.

Maybe they reduced it to 6 floors of living space and 6 floors of transparent parking ramp. 

Actually, the parking ramp crunch in the Ottawa/Fulton ramp expected from the 500 Spectrum employees may have put the skids on the tower portion for a bit. I don't know that for a fact but it was alluded to a few months ago I think in this thread or the 25 Ottawa one. 

Share this post


Link to post
Share on other sites

Personally, I think it was another stall tactic. Dig up the parking lot and I guess technically they met the promise of starting construction. I think these projects will happen but I wish they'd just get to it. How many years and how many times has this been delayed?!

joe

Share this post


Link to post
Share on other sites
On 12/13/2015 at 10:52 PM, joeDowntown said:

Personally, I think it was another stall tactic. Dig up the parking lot and I guess technically they met the promise of starting construction. I think these projects will happen but I wish they'd just get to it. How many years and how many times has this been delayed?!

joe

Someone here said the project will begin in earnest in December. Well, I'd say maybe we see action tomorrow, a Monday?

Share this post


Link to post
Share on other sites
16 hours ago, ironyisadeadscene said:

Someone here said the project will begin in earnest in December. Well, I'd say maybe we see action tomorrow, a Monday?

Maybe they will start on the 24th? haha

Joe

Share this post


Link to post
Share on other sites
19 hours ago, joeDowntown said:

Maybe they will start on the 24th? haha

Joe

 

I can see Gilmore in his office sweating bullets thinking, "When I said December, I assumed there'd be lot's of snow.  Then we could've used that as an excuse why we weren't starting.  What the hell is up with this warm weather???  I know, tear out the traffic islands.  At least it will look like we're doing something."

 

  • Like 4

Share this post


Link to post
Share on other sites
8 hours ago, wingbert said:

 

I can see Gilmore in his office sweating bullets thinking, "When I said December, I assumed there'd be lot's of snow.  Then we could've used that as an excuse why we weren't starting.  What the hell is up with this warm weather???  I know, tear out the traffic islands.  At least it will look like we're doing something."

 

I want this to be a success, but it's starting to seem like empty promises. From what I recall, this was going to be a 20, then 14, now 12 or maybe even 10 story building. I think the V.e.n.u.e. stands for: Very-empty-nightclub-unreal-expansion. 

 

  • Like 2

Share this post


Link to post
Share on other sites

Maybe Gilmore is moving ahead with the Venue (the plans all looked like pretty detailed, construction level drawings) and the tower is on hold. Orion has a lot of irons in the fire. 

Share this post


Link to post
Share on other sites

The whole thing seems awfully risky to me without parking.  Ottawa/Fulton is now totally full.  There is no way they saw that coming when this was on the drawing board.  I think it's a big enough problem that it's worth going back to the city and submitting new plans with a parking ramp, but time will tell, I suppose. 

  • Like 1

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  • Recently Browsing   0 members

    No registered users viewing this page.